Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 7, 2025 at 7:00 PM
Updated March 8, 2025
Site work and paving for a mixed-use development in Sturgeon Bay, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
S 18th Ave (Michigan to Rhode Island) and Delaware St (6th to 8th) can begin any time after the frost is out of the ground. Memorial Dr is expected to be ready following gas line work by May 1. Erie St, N 7th Ave and N 7th Pl are expected to be ready following gas line work by June 1. Florida St (18th to 19th) as well as Florida St & N 17th Dr are estimated to be ready following gas line work by July 1. Delaware St (3rd to 6th Reconstruct area) is expected to be ready by July 1. All projects are to be completed by August 30, 2025 (weather permitting). This work includes: 2,867 LF - New Concrete Curb & Gutter 9,081 SF - New Concrete Sidewalk, Apron, or Driveway 2,050 LF - Remove & Replace Concrete Curb & Gutter 12,887 SF - Remove & Replace Conc. Sidewalk, Apron, or Driveway 23 EA - Inlet Casting Height Adjustment Misc. Concrete Spillway Removals & Replacements Misc. Lawn Restoration Along with other misc. items that accompany these types of projects. The City of Sturgeon Bay reserves the right to reject any or all bid proposals or accept the bid proposal most advantageous to the City. No bid proposal shall be withdrawn without the consent of the Board of Public Works for a period of thirty (30) days after the scheduled time of closing bid proposals. No bid proposal will be received unless accompanied by a bid bond equal to at least 5% (five percent) of the bid proposal (payable to the City of Sturgeon Bay) as a guarantee, and if their bid proposal is accepted, the Contractor will execute and file the Contract and Bond forming a part of the specifications within 10 (ten) days after the award of the Contract. The Delaware Street component of this project (from N 6th Ave to N 8th Ave) is part of the Local Road Improvement Program (LRIP Project No. 19197). The Memorial Drive component of this project (from S 9th Ave to Utopia Circle) is part of the Local Road Improvement Program - LRIP Project No. 19207). Prevailing wage rates are not required for this project.
Bid Results
Sidewalks / Parking Lot
$428,068.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 19, 2025
April 21, 2025
Multiple Locations, Sturgeon Bay, WI
Related To This Project
Sturgeon Bay, WI
Bid Date: Mar 10 2025
Sturgeon Bay, WI
--
Sturgeon Bay, WI
Bid Date: Feb 19 2025
Sturgeon Bay, WI
Bid Date: Feb 03 2025
Sturgeon Bay, WI
Bid Date: Feb 03 2025
Sturgeon Bay, WI
Bid Date: Jan 07 2025
Sturgeon Bay, WI
Bid Date: Oct 31 2024
Sturgeon Bay, WI
Bid Date: Oct 31 2024
Sturgeon Bay, WI
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
