BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 18, 2025 at 7:00 PM

Updated February 19, 2025

Site work and paving for a mixed-use development in Dodge City, Kansas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of February 18 , 2025, This project has been awarded to Building Solutions, LLC for $2,383,508.10.** THE UNDERSIGNED BIDDER, having examined the plans, specifications, general and special conditions, and other proposed contract documents, and all addenda thereto; and being acquainted with and fully understanding (a) the extent and character of the work covered by this proposal; (b) the location, arrangement, and specified requirements of the proposed work; (c) the locations, character, and condition of existing streets, roads, highways, railroads, pavements, surfacings, walks, driveways, curbs, gutters, trees, sewers. utilities, drainage courses and structures, and other installation, both surface and underground, which may affect or be affected by the proposed work; (d) the nature an extent of the materials to be excavated; (e) local conditions relative to labor, transportation, hauling, and rail delivery facilities, and (f) all other factors and conditions affecting or which may be affected by the work. All work completed within 210 calendar days or by March 21st, 2025, whichever is earlier. All requests for interpretation shall be submitted to the Engineer by 12:00 p.m. on Thursday, February 6th, 2025. Answers will be placed on the web site by 11:30 a.m. the following Friday. Each Proposal shall be accompanied by a cashier's check or a certified check drawn on an acceptable bank, or an acceptable Bidder's Bond, in an amount not less than five (5) percent of the total bid amount. A. Performance Bond: A performance bond to the Owner, in an amount equal to one hundred (100) percent of the contract. B. Statutory Bond: A statutory bond to the State of Kansas in amount equal to one hundred (100) percent of the contract. The Owner reserves the right to accept the bid which, in its judgement, is the lowest and best bid; to reject any or all bids; and to waive irregularities or informalities in any bid. Bids received after the specified time of closing shall be returned unopened.

Award

Roads / Highways

$2,383,508.00

Public - City

Paving, Site Work

12

4

2

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
18
Bidding Soon
136
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2025

July 7, 2025

Project location map

Multiple Locations, Dodge City, KS

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.