EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 10, 2025 at 7:00 PM

Updated October 1, 2024

Demolition and site work for a mixed-use development in Atlantic City, New Jersey. Completed plans call for the demolition of a educational facility; and for site work for a educational facility.

Bids must be accompanied by a certified check, bank cashiers check, treasurers check or Bid Bond, with corporate surety satisfactory to the Owner, in an amount not less than 10% of the Base Bid (but in no case in excess of $20,000.00, pursuant to N.J.S.A 18A:18A-24), naming as payee or obligee, as applicable, Atlantic City Board of Education, to be retained and applied by the undersigned as provided in Contract Documents in case bidder would default in executing the Agreement or furnishing the required bonds and insurance certificates as required by Contract Documents. Prospective bidders are advised that this Project is one which will be subject and will be governed by provisions of New Jersey State Law governing (a) Prequalification of Bidders N.J.S.A. 18A:18A-26 et seq., (b) Prevailing Wage Rates N.J.S.A. 34:11-56.27, (c) Use of Domestic Materials, N.J.S.A. 1 to 52:34-4 including any amendments and supplements thereto, and (d) P.L. 1977, Chapter 33, (N.J.S.A. 54:25-24-2) listing corporate/partnership names and addresses for individuals with a share of 10% or more. The Public Works Contractor Registration Act became effective on April 11, 2000. No contractor shall bid unless the contractor is registered pursuant to this act. Pursuant to P.L. 2009, c.315 and N.J.S.A. 52:32-44, all business organizations that do business with a local contracting agency are required to be registered with the State and provide proof of their Registration with the New Jersey Department of Treasury, Division of Revenue before the contracting agency may enter into a contract with the business. In addition, and pursuant to N.J.S.A. 18A:18A-25, each bid must be accompanied by a certificate from a surety company stating it will provide said bidder with a bond in such sum as required by the above referenced statute. No proposals may be withdrawn for a period of 60 days after the date set for opening of bids. Right is reserved to waive minor irregularities and to reject bids pursuant to N.J.S.A. 18A:18A-22. Bidders must comply with the requirements of P.L. 1975, Chapter 127, N.J.A.C. 17:27 Laws Against Discrimination and NJSA 10:5-31 et seq.

Post-Bid

Educational

$300,000.00

Public - City

Demolition, Site Work

10

13

2

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Substitution Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Construction Facilities, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation, Lead Remediation
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels
Division 08 - Openings

Division 08 - Openings

Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Flooring, Carpeting, Wall Finishes, Special Wall Surfacing, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Storage Specialties, Postal Specialties, Mail Boxes
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Fertilizing, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Retaining Walls, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
72
Bidding Soon
1,319
All Active Projects
644
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2025

March 24, 2025

img_map_placeholder

23 New Jersey Ave, Atlantic City, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

New Jersey Avenue School Demolition Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.