Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 13, 2025 at 7:00 PM
Updated February 14, 2025
Site work and new construction of a municipal facility in Churchill, Manitoba. Completed plans call for the construction of a 10,000-square-foot, one-story above grade municipal facility; and for site work for a municipal facility.
Quotes are required for a new public works building, for waste management and recycling use, 7 km outside of Churchill at 58.75563869158491, -94.08301891534143. Work for this Contract comprises a quote for the materials, transport of materials and construction of a new Public Works Waste Management building consisting of a large unheated storage area, and an insulated, heated smaller area with a fire wall between. The smaller area has two offices, a contained washroom with water and sewage tanks, and an area where an in-vessel compost unit will be situated. Ventilation and heating must take into account that the building will be used to store waste. The building must meet northern building standards, and preference will be given to low carbon and green building materials and methods, although a steel structure is acceptable. (Plan/Drawing available) The site is gravel over bed rock. The foundation is to be quoted separately. Low Carbon cement is preferred. There is three phase electricity on site, but no water and sewage. For this reason tanks are needed for the washroom and water needs, and the fill and discharge will be accessible from the large area. The plan may be modified with consultation. This is a two phase competition: this first phase will pre-qualify bidders. Phase two will take place once the grant is approved. There may be changes in requirements when grant funding has been approved. Start date for the construction of the building will be summer of 2025. Submit queries and quotes to: Susan Maxson 204 254 2647 susan.maxson@churchill.ca Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.
Post-Bid
Municipal
$1,000,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 7, 2025
June 23, 2025
58.75563869158491, -94.08301891534143, Churchill, MB
Related To This Project
Churchill, MB
Bid Date: Mar 12 2025
Churchill, MB
--
Churchill, MB
--
Churchill, MB
Bid Date: Jul 04 2025
Churchill, MB
Bid Date: Mar 27 2025
Churchill, MB
Bid Date: Jun 02 2025
Churchill, MB
Bid Date: Jul 15 2025
Churchill, MB
Bid Date: Aug 15 2025
Churchill, MB
Bid Date: Dec 13 2024
Churchill, MB
Bid Date: Oct 24 2024
Churchill, MB
Bid Date: Oct 04 2024
Churchill, MB
Bid Date: Aug 21 2024
Churchill, MB
Bid Date: Jul 16 2024
Churchill, MB
Bid Date: Apr 23 2024
Churchill, MB
Bid Date: Nov 10 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
