BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 10, 2026 at 8:00 PM

Updated July 16, 2026

Site work for a mixed-use development in Fairfield, California. Completed plans call for site work for a sidewalk / parking lot; and water / sewer project.

DESCRIPTION OF WORK: The Electrical Replacement Phase 2 - Substation D Project includes the following work: _ Installation of a new, Owner-furnished prefabricated electrical building and two (2) Owner-furnished 12kV-480V pad-mounted transformers, including new equipment and building pads, Civil site work, cast-in-place concrete building landings, sidewalk, trenching, and excavation; _ Owner-furnished Electrical building, Owner-furnished 12kV-480V transformers, and appurtenances offloading, placement, and anchorage; _ Electrical duct bank, manual transfer switch, utility vault, conduits and 12kV electrical feeders installation; _ Intercepting, splicing and pulling existing feeders and controls from old Substation D switchgear, motor control centers, and PLC panel; and terminating inside the new prefabricated electrical building; _ Asphalt concrete paving and related site improvements; _ Repair and reconstruction of existing improvements affected by the Work, and incidentals for a complete and usable facility within the Fairfield-Suisun Sewer District's Wastewater Treatment Plant; Question Deadline 07/01/2026 All questions or other communications relative to this WORK shall be directed to the ENGINEER Fairfield-Suisun Sewer District Ian Bronswick, P.E. (707) 428-9107 ibronswick@fairfieldsuisunsewer.ca.gov COMPLETION OF WORK: The WORK must be completed within four hundred fiftysix (456) calendar days after the commencement date stated in the Notice to Proceed. BID SECURITY: Each Bid shall be accompanied by a certified or cashier's check or Bid Bond executed by a California admitted surety insurer in the amount of 10 percent (10%) of the Total Bid Price payable to the Fairfield-Suisun Sewer OWNER as a guarantee that the Bidder, if its Bid is accepted, will execute the Agreement within 14 calendar days after receipt of the agreement forms from OWNER, and will furnish the insurance certificates and endorsements, Payment Bond, and Performance Bond required by the Contract Documents within such 14 days. PAYMENT AND PERFORMANCE BONDS: The Bidders are advised that the Contract Documents require a payment bond and a performance bond, each in the amount of 100 percent (100%) of the Contract Price, to be written by California admitted surety insurers.

Post-Bid

Water / Sewer

$3,266,000.00

Public - City

Site Work

5

8

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
517
Active Projects
10
Bidding Soon
3,485
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2026

August 10, 2026

Project location map

1010 Chadbourne Rd, Fairfield, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.