BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 4, 2025 at 8:00 PM

Updated April 5, 2025

Site work and paving for a mixed-use development in Tifton, Georgia. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of April 4, 2025 project was awarded to Southern Concrete Construction Company in the amount $2,099,265.65 PE-73750-NONST-2025-000000018 The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed 18th Street Ditch Improvements as shown on the construction drawings. In general, construction consists of the removal of four bridge driveway structures over the south side ditch and their replacement with four double 8ft x 8ft concrete box culverts. The project also includes the installation of a concrete side barrier, curb and gutter, and guardrail as well as roadway asphalt overlay, utility adjustment relocation and all other associated appurtenances required for a complete project, as outlined in the construction drawings and specifications. Question Deadline 02/17/2025 All questions about the meaning or intent ofthe Bidding Documents are to be submitted to Engineer in writing. Questions received less than ten days prior to the date for opening ofBids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. No bid may be withdrawn after the closing time for receipt of bids for a period of sixty (60) days. Contractor License: Bidders submitting a bid of $2,000,000 or less must be either prequalified contractor or a registered subcontractor with the Georgia Department of Transportation. Bonds: All bid forms must be accompanied by a Bid Bond in an amount not less than ten percent (10%) of the amount bid. The successful bidder, if awarded the Contract, will be required to furnish a Performance Bond of one hundred percent (100%) of the Contract amount and Payment Bond in the amount of one hundred ten percent (110%) of the Contract amount. All bonds must appear on the Treasury Department's most current Circular 570 Listing Standard Specifications & DBE Goal: Georgia Department of Transportation Standard Specifications, 2021 Edition, and applicable Supplemental Specifications and Special Provisions apply to this project. The DBE goal for this project is 5%. *The Owner, reserves the right to reject any or all bids, to waive informalities, and to re-advertise.

Award

Roads / Highways

$2,099,266.00

Public - City

Paving, Site Work

47

10

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
46
Bidding Soon
546
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2025

February 26, 2025

Project location map

18th St, Tifton, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.