BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 25, 2025 at 7:00 PM

Updated February 26, 2025

Site work for a mixed-use development in Florissant, Missouri. Completed plans call for site work for a road / highway; and sidewalk / parking lot.

Any questions regarding the specifications are to be directed to Danielle Thomas, Director of Purchasing & Supplier Diversity no later than February 20, 2025 at 12:00p.m Bid Specifications: The specifications are as follows: Mill and Overlay (All the following locations Except Proposed New Parking Lot at McNair) : Arrowpoint Elementary: 2017 Arrowpoint Drive, St. Louis MO, 63138 Barrington Elementary: 15600 Old Halls Ferry Road, Florissant MO, 63034 Grannemann Elementary: 2324 Redmann Road, St. louis MO, 63136 Jamestown Elementary: 13750 Old Jamestown Road, Florissant MO, 63033 Jana Elementary: 405 Jana Lane, Florissant MO, 63031 Lawson Elementary: 1830 Charbonier Road, Florissant MO, 63031 McNair elementary: 585 Coachway Lane, Hazelwood MO, 63042 Walker Elementary: 1250 Humes Lane, Florissant MO, 63031 Family Outreach Center: 13780 Old Halls Ferry Road, Florissant MO, 63033 North Middle: 4420 Vaile Avenue, Florissant MO, 63034 Northwest Middle: 1605 Shackelford Road, Florissant MO, 63031 o Rotomill 2" of existing asphalt pavement. o Add SS-1 Tack Coat to aid the bonding of asphalt to the milled surface. o Install 2-inch-thick asphalt surface course in one lift. o Striping and Signage o Install one coat of traffic marking paint per layout(s). o Replace all wheel stops/parking bumpers. McNair Proposed New Parking Lot o Provide survey and design drawings of prospective parking lot. o Excavate, haul off, and fine grade existing dirt for pavement installation. o Install eight inches {8") of one inch (1") Minus aggregate base in one lift. o Install 2" of Commercial X asphalt base course in one lift. o Install 2" of Commercial C asphalt surface course in one lift. o Install approximately 71 LF of asphalt curb were shown on drawing. o Backfill, seed, & straw around perimeter of new asphalt lot. o Install new wheel stops/parking bumpers. Permitting including any from MSD should be included in contractor's price. Please provide the T/M (time and material) price for the following: o Remove and/or provide asphalt curb price per/LF o Soft spot mitigation per square feet/yard Proposed work schedule: Barrington, Lawson, and McNair should be completed April 14-21, 2025. All others should be completed from July 1,2025-August 1,2025 The Hazelwood School District has established a Supplier Diversity Program to provide opportunities for the meaningful participation of Minority Business Enterprises (MBEs) and Women Business Enterprises (WBEs) in purchases made by the District. To this end the District has set goals for participation on all construction projects of 25% for MBEs and 5% for WBEs. The Supplier Diversity Program also encourages its business partners to strive for a workforce goal of twenty five percent (25%) minority and five percent (5%) women. The District may reject any and all bids that do not meet its program goals.

Post-Bid

Sidewalks / Parking Lot

$550,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
266
Active Projects
136
Bidding Soon
1,299
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2025

April 14, 2025

Project location map

Multiple Locations, Florissant, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.