BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 19, 2025 at 8:00 PM

Updated July 22, 2025

Renovation of a mixed-use development in West Palm Beach, Florida. Completed plans call for the renovation of a educational facility.

Reference Number 0000374124 The project scope includes repair and renovation for the roofing of (3) existing buildings 6, 7 & 8 as noted below. Roof recovery & replacement varies by building area as shown below. The total roof area to be re-roofed is approximately 104,560 SQ.FT. See below for the scope breakdown per building. All work is to be completed per approved specifications and approved plans. BUILDING 6 - AREA 6A: APPROX. ROOF AREA - 12,560 SQ. FT. Re-roof over existing roof using liquid applied membrane New flashings, drip edges, etc., replace gutters Building 6 - area 6b-6g: approx. Roof area - 16,300 sq. Ft. Replace roof (LWC to remain) w/ new modified bitumen 2-ply Existing MEP penetrations, repair and renovations Provide new gutters as shown New cants, copings, flashings, drip edges, etc. New expansion joints as required Replace overflow drainage bowls Provide roof ladder BUILDING 7 - AREA 7K & 7N: APPROX. ROOF AREA - 9,600 SQ. FT. Re-roof over existing roof using liquid applied membrane Existing MEP penetrations, repair and renovations New cants, copings, flashings, drip edges, etc. New expansion joints as required Provide new gutters as shown Replace overflow drainage bowls Minor stucco repairs Exterior lights BUILDING 7 - ALL AREAS EXCEPT AREA 7K & 7N: APPROX. ROOF AREA - 46,100 SQ. FT. Re-roof over existing roof w/ new modified bitumen 2-ply Existing MEP penetrations, repair and renovations New cants, copings, flashings, drip edges, etc. New expansion joints as required Replace overflow drainage bowls Provide new roof hatch & ladders Exterior lights BUILDING 8 - ALL AREAS: APROX. ROOF AREA - 20,000 SQ. FT. Re-roof over existing roof w/ new modified bitumen 2-ply Existing MEP penetrations, repair and renovations New cants, copings, flashings, drip edges etc. New expansion joints as required Replace overflow drainage bowls EXISTING LIGHTNING PROTECTION Remove and reinstall existing lightning protection (Refer to electrical drawings ELEC-CD-A-08.02.2024). All work to be completed per approved specifications and approved plans. DIRECTIONS: I-95 to Okeechobee Blvd., East to Tamarind Ave. Turn North on Tamarind to Fern St. Turn East on Fern to Parking Area. School is just north of the Kravis Center. Established Project Budget for Construction: $2,400,000.00 Question Deadline 02/25/2025 at 2:00 PM ET Questions are submitted online Yes

Post-Bid

Educational

$2,400,000.00

Public - County

Renovation

57

10

2

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
3
Bidding Soon
1,120
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2025

May 9, 2025

Project location map

501 S Sapodilla Ave, West Palm Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.