BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 4, 2025 at 8:00 PM

Updated April 5, 2025

Renovation of an educational facility in Overland Park, Kansas. Completed plans call for the renovation of a educational facility.

Bid Clarifications Due February 7, 2025: 5pm CST Buyer: Larry Allen Lallen35@jccc.edu Description JCCC is accepting bid proposals for the replacement of two (2) air handling units (AHU) in the GYM building. NOTE - All inquiries in regard to this bid must be submitted via the "Clarifications" tab that can be accessed after registration and approval on the JCCC Bid Portal Procureware site. The following is an outline of the scope of work for the removal of existing chilled water air handling unit and replacing it with new at the gym facility. Contractor shall include in Bid all time, material and support services required for a complete and operational system(s). 1. Remove and replace existing chilled water air handling with new chilled water air handling unit as indicated on mechanical plans. 2. Provide new motor starter disconnect. 3. Mechanical contractor shall include in bid all costs of required permits for completion of work. 4. Coordinate access to site with jccc representative. Walk site prior to installation with jccc and repair or replace any damaged ground, walks, etc… during installation. 5. Jccc shall remove existing system controls from air handling unit. Jccc shall reinstall controls in new air handling unit. Mechanical contractor to test system (coordinate with Owner on testing of system) after re-install to confirm system is in good working operation. Work shall include duct mounted smoke detector that’s interlocked with building fire alarm system. 6. Shut down existing unit(s), disconnect power, disconnect ductwork, disconnect damper actuators on dampers where requested and disconnect, drain, and remove piping from air handling unit. Contractor shall coordinate removal and reinstallation of all control devices and retain for reinstallation. Remove and dispose of unit(s) and all associated debris at main campus south compound. 7. Contractor shall provide new chilled water piping as shown on plans. Piping material and insulation shall match existing. 8. Contractor shall remove existing rgf air purification/uv lighting system from main ductwork near each ahu unit as needed to avoid damage to system. Contractor shall Reinstall system after ahu unit replacement. Confirm with manufacturer of air purification. System all requirements to remove and reinstall to avoid damage. Test system (coordinate with manufacturer on testing of system) after re-install to confirm system is in good working operation. 9. Install new johnson control valve and circuit setter (reference attached schedule for control valve schedule) in new piping. 10. Control valves shall be procured thru johnson controls. 11. All fire alarm word demo and install shall be done by jci fire. 12. Circuit setters shall be bell & gossett circuit setter calibrated balance valves with flanged connections or as required to meet existing piping. 13. Confirm existing conduit and wiring is in good working order. Reconnect power feeder to each unit and extend/modify feeders as required. 14. Provide start up, including nebb testing and balancing of new and existing units including water and air flow. Contractor is not responsible for any balancing of downstream ahu devices.

Award

Educational

$299,700.00

Public - County

Renovation

14

8

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
104
Bidding Soon
1,181
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2025

March 21, 2025

Project location map

12345 College Blvd, Overland Park, KS

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.