Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 26, 2025 at 8:00 PM
Updated June 21, 2025
Site work and paving for a road / highway in Orlando, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Counties: Orange Road Name: Sr 434 (N Alafaya Tr) Limits: From Centaurus Dr to Seminole Co Line Project(s): 44879915201(*) Federal Aid No: D524041B Total Roadway Length: 0.609 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 0.609 Miles Contract Days: 100 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 30 Days Proposal Budget Estimate: $1,294,931.00 The Improvements under this Contract consist of, but not limited to, maintenance of traffic, milling and resurfacing, signing, and pavement markings along SR 434 from MP 2.456 to MP 3.113 in Orange County. Prequalification per Rule 14-22 is not required. It is only necessary to submit the Small Business Affidavit (SBA) form once per year. Send a completed and notarized affidavit as an attachment to: fdot.bdi@dot.state.fl.us. Bidders must submit the BDI Reference Sheet (Form No. 275-000-02) with the bid unless bidder is prequalified in the project major work type, per Rule 14-22, Florida Administrative Code Proposal Guaranty of $500 is required for bids over $150,000 and may be in the form of a Cashiers Check, the BDI Bid or Proposal Bond (Form No. 375-020-16), or the standard Bid or Proposal Bond form, Form No. 375-020-09). Question Deadline 02/19/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 016 -Resurfacing - SR 434 (N Alafaya TR)
Award
Roads / Highways
$1,377,191.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 26, 2025
March 10, 2025
N Alafaya Trail, Orlando, FL
Related To This Project
Orlando, FL
Bid Date: Feb 26 2025
Orlando, FL
Bid Date: Feb 03 2025
Orlando, FL
Bid Date: Apr 15 2025
Orlando, FL
Bid Date: Feb 19 2025
Orlando, FL
--
Orlando, FL
Bid Date: Feb 28 2025
Orlando, FL
Bid Date: Mar 06 2025
Orlando, FL
Bid Date: Mar 11 2025
Orlando, FL
Bid Date: Feb 07 2025
Orlando, FL
Bid Date: Feb 11 2025
Orlando, FL
Bid Date: Feb 28 2025
Orlando, FL
Bid Date: Feb 25 2025
Orlando, FL
Bid Date: Feb 21 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
