BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 2, 2025 at 8:00 PM

Updated May 3, 2025

Site work for a water / sewer project in Jourdanton, Texas. Completed plans call for site work for a water / sewer project.

**As of May 2, 2025, the project was awarded to T Construction LLC, but the awarded amount is not available.** Aged Sanitary Sewer Replacement Estimate: $1,417,406.00 This project consists of the replacement of gravity sewer and manholes at various locations within the City. Proposals will be received for a single Contract. Proposals shall be provided on a unit price basis as indicated on the Proposal Form. This contract is contingent upon release of funds from the Texas Water Development Board (TWDB). Any contract(s) awarded under this Invitation for Bid (IFB), Request for Proposals (RFP), or Request for Qualifications (RFQ) is/are expected to be funded in part by financial assistance from the TWDB. Neither the U.S. Environmental Protection Agency (EPA) or the State of Texas, nor any of its departments, agencies, or employees, are or will be a party to this IFB, RFP, RFQ, or any resulting contract. The deadline to ask questions is 2/25/2025 5:00 PM CST A bid bond in the amount of five percent (5%) of the bid issued by an acceptable surety shall be submitted with each proposal. The successful respondent will be required to furnish a Performance Bond and a Payment Bond, each in the amount of the contract written by a responsible Surety Company, authorized to do business in the State of Texas. The City of Jourdanton expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities. The project will be awarded to the respondent who provides the best value to the City of Jourdanton based on (1) the selection criteria and the weighted value for those criteria and (2) the ranking evaluation. A Respondent's failure to respond to the requested qualifications inquiry may result in the proposal being deemed non-responsive. Any contract(s) awarded under this Invitation for Bids is/are subject to the American Iron and Steel (AIS) requirements of federal law, including federal appropriation acts and/or Section 608 of the Federal WateR Pollution Control Act. Equal Employment Opportunity and Affirmative Action- All qualified applicants will receive consideration for employment without regard to race, color, religion, sex (including pregnancy), sexual orientation, gender identity, national origin, age (40 or older), disability, or genetic information. Any contract awarded under this RFP will be required to comply with the Department of Labor regulations at 41 CFR Part 60-4, relating to Construction Contractors--Affirmative Action Requirements, which include the President's Executive Order No. 11246, as amended by Executive Order No. 11375 and Executive Order No. 13672, in the award and administration of contracts awarded under TWDB financial assistance agreements. Failure by the Contractor to carry out these requirements is a material breach, which may result in the termination of the awarded financial assistance. Davis-Bacon prevailing wage requirements apply to the construction, alteration, or repair of treatment works carried out, in whole or in part, with assistance made available by the Clean or Drinking Water State Revolving Fund Programs (CWSRF or DWSRF). For additional information on Davis-Bacon Wage Rate Requirements and its applicability to this contract, please consult TWDB Guidance No. DB-0156. In accordance with Chapter 2269 of the Texas Government Code, the contract will be awarded to the responder who provides the best value to the City of Jourdanton. The City of Jourdanton shall evaluate the Responses on the basis of all factors described herein. The City of Jourdanton reserves the right to refuse and reject any or all responses, waive any or all formalities or technicalities, accept the response or portions of the response determined to be the best value to the City of Jourdanton, and hold the responses for a period of 90 days without taking action. Respondents are required to hold their responses firm for the same period of time. The method of Contractor Selection has not been Determined at this time.

Award

Water / Sewer

$1,417,406.00

Public - City

Site Work

36

16

6

5

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
65
Bidding Soon
1,093
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2025

May 12, 2025

Project location map

Multiple Locations, Jourdanton, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.