Published March 27, 2025 at 8:00 PM

Updated March 29, 2025

Renovation of a water / sewer project in Bayonne, New Jersey. Completed plans call for the renovation of a water / sewer project.

The project generally consists of the work and equipment necessary to complete the furnishing and turn-key installation one (1) 150-kW Generator and one (1) 125-kW Generator for service for the Avenue J Pump Station and MOT #2 Pump Station, respectively, and will also consist of a geotechnical investigation and report to determine subsurface soils conditions, a structural analysis and design to provide an adequate foundation and/or steel platform to support the surcharge from the generators and ensure the generators are set above the 500-year flood elevation, an electrical subcontractor in order to ensure all electrical and generation installation is done in accordance with the electrical and building codes and a site contractor to provide the necessary equipment and manpower in order to furnish and install the generators, and related work within the City of Bayonne, and all other associated work as contained in the Contract Documents or as ordered by the Engineer. Each bid must be accompanied by a certified check or cashier's check in the amount of not less than ten (10%) percent of the Bid, but not more than $20,000.00, payable without any conditional endorsement as a guarantee that in case the contract is awarded to the bidder, he will within ten (10) days thereafter execute such contract and furnish satisfactory performance bond. Upon failure to do so he shall forfeit the deposit as liquidated damages and the acceptance of the bid will be contingent upon the fulfillment of this requirement by the bidder. No interest shall be allowed upon any such certified check or cashier's check. A bid bond in the amount of ten (10%) percent of the bid, but not more than $20,000.00, may be substituted for certified check or cashier's check. The City reserves the right to award this contract based on funds available. All bidders are required to be registered with the New Jersey Department of Labor if they elect to bid public works projects. No bidder may withdraw his bid for a period of sixty (60) days after the date set for the opening thereof. The successful bidder will be required to furnish a surety company bond in the full amount of contract price indemnifying the City of Bayonne, New Jersey, for all proceedings, suits or actions of any kind of description and conditional for the faithful performance of the work. All bid security will be returned to all Bidders except the three (3) apparent lowest bidders within 10 working days after the opening of bids, and to the three (3) apparent lowest Bidders within three (3) working days after the successful Bidder has executed the Contract and his Contract security has been approved by the City. The City reserves the right to reject any or all bids if in its opinion it is in the best interest to do so and to award the contract for any and/or all items. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Award

Water / Sewer

$999,375.00

Public - City

Renovation

13

16

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Flooring, Access Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Vibration and Seismic Controls for Electrical Systems, Identification for Electrical Systems, Overcurrent Protective Device Coordination Study, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Trenching and Backfilling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Manufacturing Equipment, Dies and Molds, Dies, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
485
Active Projects
260
Bidding Soon
4,913
All Active Projects
2,127
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2025

March 13, 2025

img_map_placeholder

Multiple Locations, Bayonne, NJ


Fuel growth with access to the bidding project info your business needs.