BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 27, 2025 at 7:00 PM

Updated February 28, 2025

Site work and new construction of an educational facility in Berkeley, California. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

University of California, Berkeley Heathcock Hall, New Chemistry Building . Plant Construction and UCB seeks responses to a Bid from Trade Subcontractors interested in bidding the Structural Concrete scope for the University of California, Berkeley Heathcock Hall located in Berkeley, California. Plant Construction seeks trade contractors with significant experience in Concrete for projects that involve challenging logistical conditions and aggressive schedules. Contractors must hold valid contractors' licenses registered with DIR and must provide ability to obtain corporate surety (payment & performance) bonds and insurance in order to be eligible for the RFP evaluation. Licenses are required as follows: C-8 License This is an open bid opportunity to all subcontractors. Subcontractors must complete the prequalification statement for a responsive bid. Subcontractor's bids that do not meet the minimum qualifications will disqualified and their bids will not be accepted. Question Deadline 02/07/2025 at 12:00 PM PT Bidding RFI responses to be distributed February 14th, 2025 The University intends to cover this project, and all eligible Contractors and Subcontractors of all tiers contracted to perform work at this at this project, under its University Controlled Insurance Program (UCIP). The UCIP provides workers compensation, general liability and excess umbrella liability insurance coverage to all enrolled Contractors and Subcontractors of any tier for work performed at the project site. The project specific UCIP manual can be found within the Bid Manual files tab. Pre-bid Estimate (based on 30% CDs): $5,159,000. Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University Policy Plant reserves the right to reject any or all responses to the RFP and to waive immaterial errors in any response received. Bid Result. Deep Foundation: Drill Tech Drilling & Shoring, Inc $455,800 Metal Fabrications & Railings: Olson Steel $1,518,800 Sheet Metal and Flashing: Mauck Sheet Metal $604,149 Plaster:California Drywall $842,550 Acoustical Ceilings: Stockham Construction Inc $338,665

Bid Results

Educational

$3,759,964.00

Public - State/Provincial

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 21, 2025

March 24, 2025

Project location map

To Be Determined, Berkeley, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.