BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 1, 2025 at 8:00 PM

Updated May 2, 2025

Site work and new construction of a pre-engineered storage facility in Colorado Springs, Colorado. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

** As of 5/1/2025 project has been awarded to VSP Structures with an amount of $216,410. ** Reference Number 0000374674 Job Location 8495 Fontaine Blvd Colorado Springs, Colorado United States 80925 The District is seeking to install structures and measures to protect fleet vehicles and personal employee vehicles from hail damage that is common in southern El Paso County, Colorado. The District has identified a specific product desired. A. To obtain competitive bids from vendors capable of designing and constructing pre-engineered hail protection and shade structures. B. To select a vendor to perform this work. SCOPE OF THIS PROJECT A. To select a vendor to design and construction hail protection and shade structures at the District's Administration Building. B. Duties and responsibilities of the Vendor to include: a. Coordinate with District's Director of Administrative Services, Engineer, and District Manager design, construction and installation of hail protection and shade structure. b. Ensure all permits are obtained and entities' concerns are being met. c. Design and engineering for High Density Propylene (HDPE)-based fabric structure project. d. Design drawings and calculations, wet-sealed by a state of Colorado-licensed Professional Engineer. e. Fabrication of all applicable structural steel and HDPE fabric. f. Installation of standard foundations, structural steel, and HDPE fabric, tension cables, and clamps. g. Public and private line locating. h. Special inspections. i. Application for and acquisition of a building permit from the authority having jurisdiction. j. All design drawings and specifications must be submitted to the District for approval. C. Owners Responsibilities a. Owner has final approval on all changes to the project. b. Owner shall review pay applications and make payments. Question Deadline 02/05/2025 at 5:00 PM MT Questions are submitted online No, Your primary contact for any questions or comments regarding the attached document is Kelly Smith, Director of Administrative Services; kelly@wwsdonline.com. Your secondary contact is Lucas Hale, District Manager; lucas@wwsdonline.com. Critical Dates-Note: The District is having the parking lot resurfaced and repainted (scheduled to begin May 1, 2025). This must be completed in advance of the project start date. The District reserves the right to accept or reject any proposals made to it in response to this RFP whether in whole or in part. The District makes no guarantee whatsoever implied or otherwise that it will contract or agree to contract with any party because of this RFP

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$216,410.00

Public - City

New Construction, Site Work

3

5

4

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
55
Bidding Soon
862
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 14, 2025

May 1, 2025

Project location map

8495 Fontaine Blvd, Colorado Springs, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.