EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 1, 2025 at 7:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Falmouth, Massachusetts. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The project consists of improvements to the intersection, including roadway widening, new sidewalks, and new traffic signals. All questions about the meaning or intent of the Contract Documents shall be received in writing by the Town of Falmouth, Department of Public Works, Engineering Division, 416 Gifford Street, Falmouth, MA 02540 at least ten (10) days before the date set herein for the opening of bids. General Bids must be accompanied by a bid deposit. The amount of the bid deposit shall be an amount of 5 percent (5%) of the Bidder's maximum total bid price, payable to the Town of Falmouth, MA. The bid security will be retained until the successful bidder has executed the contract with the Town, whereupon it will be returned. If the bidder fails to execute the contract within 30 calendar days of the Notice of Award, the Town may annul the award and the bid security will be forfeited. Bidders may not withdraw their Bids for a period of 120 calendar days, after the actual date of the opening of the Bids. The successful Bidder must furnish a 100 percent (100%) Construction Performance Bond and a 100 percent (100%) Construction Payment Bond with a surety company licensed to do business in the Commonwealth of Massachusetts. The Town reserves the right to waive any informality in or reject any and all Bids, or to accept the Bid deemed to be in the best interest of the Town of Falmouth. Question Deadline 02/11/2025

Post-Bid

Roads / Highways

$1,258,000.00

Public - City

Paving, Site Work

32

6

13

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting, Special Purpose Lighting, Hazard Warning Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Control Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Machining Equipment, Boring Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
273
Active Projects
155
Bidding Soon
2,158
All Active Projects
957
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2025

April 29, 2025

img_map_placeholder

Main St & Scranton Ave, Falmouth, MA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Scranton and Main Intersection 2025

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.