Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 13, 2025 at 8:00 PM
Updated March 14, 2025
Site work for a civil project in Falmouth, Massachusetts. Completed plans call for site work for a water / sewer project.
The work of the base bid consists of; the replacement of media in the existing air stripper tower at the Crooked Pond WTP including removal and disposal of the existing media, cleaning the tower and the Wet well Tank below the air tower, and the furnishing and installation of new media. GAC media replacement for two existing carbon contactors shall be Additive Alternate A based on the availability of funds and the proposed pricing in the Form For General Bid. Additive Alternate A will consist of the removal and disposal of existing carbon media in each of the two existing carbon contactors, cleaning the carbon contactors and a Backwash Recycle Tank, and the furnishing and installation of new GAC media. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Each bid shall be accompanied by a bid security in the amount of 5% of the total bid amount. A Performance Bond and Labor and Materials Payment Bond each in the amount of 100% of the contract price will be required. The Work of the Base Bid consists of the replacement of media in the existing air stripping tower at the Crooked Pond Water Treatment Plant including removal and disposal of the existing media, cleaning the tower and the Wetwell Tank below the air tower, and the furnishing and installation of new media. Granular Activated Carbon (GAC) media replacement for two existing carbon contactors shall be included in the Contract if the Owner proceeds with an Additive Alternate A based on the availability of funds and the proposed pricing in the Form For General Bid. Additive Alternate A will consist of the removal and disposal of existing carbon media in each of the two existing carbon contactors, cleaning the carbon contactors and a Backwash Recycle Tank, and the furnishing and installation of new GAC media. All Work shall be Substantially Complete within 210 consecutive calendar days of the date fixed in the Notice to Proceed and fully completed within 240 consecutive calendar days of the date fixed in the Notice to Proceed There will be no pre-bid conference Question Deadline 02/20/2025 All questions and requests for information about the meaning or intent of the Bidding Documents are to be submitted in writing to the Engineer, Tata and Howard, Inc., attention Kimberly Frary, at kfrary@tataandhoward.com. Interpretations or clarifications considered necessary by Engineer in Questions received less than five business days prior to the date fixed for opening of bids will not be answered. Only changes by formal written addenda shall become part of the Contract Documents.
Bid Results
Water / Sewer
$468,550.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 27, 2025
March 31, 2025
To Be Determined, Falmouth, MA
Related To This Project
Falmouth, MA
Bid Date: Feb 27 2025
Falmouth, MA
Bid Date: Feb 27 2025
Falmouth, MA
Bid Date: Mar 19 2025
Falmouth, MA
Bid Date: Mar 05 2025
Falmouth, MA
Bid Date: Mar 19 2025
Falmouth, MA
Bid Date: Mar 21 2025
Falmouth, MA
Bid Date: Mar 18 2025
Falmouth, MA
Bid Date: Apr 03 2025
Falmouth, MA
Bid Date: Feb 21 2025
Falmouth, MA
Bid Date: Feb 28 2025
Falmouth, MA
Bid Date: Feb 05 2025
Falmouth, MA
Bid Date: Feb 14 2025
Falmouth, MA
Bid Date: Jan 17 2025
Falmouth, MA
Bid Date: Jan 22 2025
Falmouth, MA
Bid Date: Jul 18 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
