Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 5, 2025 at 7:00 PM
Updated March 6, 2025
Renovation of a clubhouse / community center in Falmouth, Massachusetts. Completed plans call for the renovation of a clubhouse / community center.
**As of February 21, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The Town of Falmouth is accepting quotes to furnish and install approximately 4,600 square feet of carpet, 245 linear feet of cove base, all associated doorway transitions, 58 stair treads and risers at Gus Canty Community Center, located at 790 Main Street Falmouth, MA 02540. Quotes must include removal and disposal of all existing carpet, cove base, transitions, stair treads and risers. The work will be completed at non-premium rates, scheduled for a mutually agreed upon time, upon acceptance of the proposal. A detailed scope of the project is attached. All quantities are estimates and should be verified by the contractor. Minimum wage rates are required by M.G.L. c.l49 26 to 27H for this project. Current rates will be provided by the Town of Falmouth and weekly certified payrolls shall be supplied by the contractor before any invoices are paid. First Floor Offices and Second Floor Meeting Rooms and Hallways o Remove and dispose of approximately 4,600 square feet existing carpet adhered to concrete floor. o Concrete Floor prep as required. o Furnish and install approximately 4,600 square feet of new flooring o Product- Kinetex Against the Grain 1840 Plank 12" x 48" or equal. o Furnish and install approximately 245 linear feet of 4" cove base with 1/8" toe. o Product FLEXCO Value Vinyl Base, or equal Stairs - between the gymnasium and first floor and between the first and second floors o Remove and dispose of approximately 58 existing stair treads and risers. o Prep as required. o Furnish and install approximately 58 stair treads and risers (18 x 42" and 40 x 48") o Products- Flexco 550 Rubber stair treads and matching Flexco 7" rubber risers or equal.
Award
Clubhouse / Community Centers
$47,715.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 5, 2025
March 7, 2025
790 Main St, Falmouth, MA
Related To This Project
Falmouth, MA
Bid Date: Feb 28 2025
Falmouth, MA
Bid Date: Feb 21 2025
Falmouth, MA
Bid Date: Feb 27 2025
Falmouth, MA
Bid Date: Feb 27 2025
Falmouth, MA
Bid Date: Feb 27 2025
Falmouth, MA
Bid Date: Mar 19 2025
Falmouth, MA
Bid Date: Mar 05 2025
Falmouth, MA
Bid Date: Mar 19 2025
Falmouth, MA
Bid Date: Feb 14 2025
Falmouth, MA
Bid Date: Jan 17 2025
Falmouth, MA
Bid Date: Jan 22 2025
Falmouth, MA
Bid Date: Jul 18 2019
Falmouth, MA
Bid Date: Jul 30 2019
Falmouth, MA
Bid Date: Jan 31 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
