EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 26, 2025 at 7:00 PM

Updated October 1, 2024

Site work and paving for a sidewalk / parking lot in Miami, Florida. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Sidewalk Improvements Estimated Cost: $444,597.20 License Requirement: Paving; Concrete Engineering Scope of Work: Work Under This Contract Includes Furnishing of All Supervision, Labor, Materials, Tools, Equipment and Performing All Operations Required to Construct the Work in Accordance With the Contract Documents. Work Includes Construction of New Sidewalks, Sidewalk Connectors, Driveway Approaches, Curb Ramps, Curbs and/or Gutters; Reconstruction and/or Repair of Existing Sidewalks, Sidewalk Connectors, Driveway Approaches, Curb Ramps, Curbs and/or Gutters; Removal and Disposal of Various Existing Pavements, Trees, Tree Roots and Debris; Grading and Preparation of Subgrade and Sodding; and Adjustment of Existing Utility Valve Covers to New Finished Grade. One or a Combination of More Than One of the Work Described Herein May Be Required to Be Performed at Any Given Site Pursuant to the Requirements of the Work Order Governing the Site. If Any Changes Are Required Due to Conflict of Design and or Field Conditions, the Engineer Will Make the Final Determination. The Contractor and All Subcontractors, Under This Contract, Are Prohibited From Performing Any Work, Other Than Specified in the Contract and/or Directed by the Engineer, Within the Limits of the Project Site, Without Prior Written Notification to the Engineer. This Includes Any Work for Private or Commercial Entities. Contractor Must Refer to the Request for Price Quotation (Rpq) and Associated Project Documents for the Detail Scope of Work This Project is Considered a Single Trade or Primarily Single Trade Project. Primary Trade Related Work Shall Not Be Subcontracted. If Ancillary (Trade) Work is Required to Complete This Project You May Contract With a Subcontractor With Approval From the Contracting Department and the Office of Small Business Development. All Subcontractors Must Be Certified Sbe-cons Firms and Approval Given by the Office of Small Business Development Prior to Any Work Beginning Location of Work: a. This is a Work Order Driven Contract. Nw 199 St From Nw 57 Ave to Nw 67 Ave, Nw 95 St From Nw 7 Ave to Nw 17 Ave, Nw 32 Ave From Nw 62 St to Nw 95 St Ne 2 Ave From Ne 103 St to Ne 115 St Contractor Must Refer to the Request for Price Quotation (Rpq) and Associated Project Documents for the Detail Scope of Work. Experience Requirement: 1. The Bidder Must Demonstrate That It Has Full-time Personnel With the Necessary Experience to Perform the Project's Scope of Work. This Experience Shall Include Work in Successfully Completed Projects Performed by the Identified Personnel Whose Bulk of Work Performed in the Public Right-of-way is Similar in Detail to the Project's Scope of Work Described in These Solicitation Documents. Demonstrate the Experience Requirement by: a. Providing a Detailed Description of at Least Three (3) Projects Similar in Detail to the Project's Scope of Work Described in These Solicitation Documents and in Which the Bidder's Identified Personnel is Currently Engaged or Has Completed Within the Past Five Years. Contact Person: Bryan Rodriguez - Email Address: Bryan.rodriguez3@miamidade.go

Post-Bid

Sidewalks / Parking Lot

$444,597.00

Public - County

Paving, Site Work

3

20

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Precast Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics, Furnishings and Accessories, Bedroom Furnishings, Blankets, Furniture, Residential Furniture, Beds
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Roadway Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Pruning, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Painted Pavement Markings, Planting, Planting Preparation, Mulching, Turf and Grasses, Plugging, Seeding, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Manufacturing Equipment, Machining Equipment, Boring Equipment

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
59
Bidding Soon
1,246
All Active Projects
557
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2025

April 30, 2025

img_map_placeholder

Multiple Locations, Miami, FL

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Sidewalk Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.