EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 19, 2025 at 7:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Edgewood, Kentucky. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The City of Edgewood is seeking a qualified entity or individual to provide the goods and/or services described herein. The City anticipates selecting one firm to perform the services. Bids are requested from Companies that have a demonstrated ability to perform the tasks identified in this Invitation for Bid. Project includes the milling and resurfacing of the existing asphalt pavement on Beckridge Drive from Charter Oak Road to the End of Street (approximately 1600 LF). Project will include the full depth repair of the existing asphalt pavement as needed prior to resurfacing. Work may begin after July 1, 2025 and must be completed by October 15, 2025. Question Deadline 02/11/2025 at 12:00 PM ET. All bids shall remain valid for a period of sixty (60) days from the date of Bid Opening. Bid Guaranty* Please upload a copy of your Bid Guaranty. Hard copy Bid Guaranty shall be made available upon request.

Award

Roads / Highways

$91,643.00

Public - City

Paving, Site Work

7

7

2

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Execution and Closeout Requirements, Execution, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
75
Bidding Soon
1,297
All Active Projects
531
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 13, 2025

July 1, 2025

img_map_placeholder

Beckridge Dr, Edgewood, KY


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Edgewood 2025 Pavement Resurfacing

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.