BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 29, 2025 at 8:00 PM

Updated April 30, 2025

Site work and paving for a mixed-use development in Morrice, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

This project consists of removal and replacement of existing sidewalk on the South Side of First St. between Morrice Road and Main Street, all within the street R.O.W. and within the Village of Morrice Village Limits. Construction shall include: removal and replacement of 4" concrete sidewalk totaling approximately 2400 sq. ft.; removal and replacement of 6" concrete sidewalk totaling approximately 320 sq. ft.; signing, barricades and traffic control; Pedestrian traffic control and lawn restoration and clean-up; and other miscellaneous work items that are normally included with the described work items. Project estimate: $34,480.00 Specifications: The Contractor is solely responsible to obtain any and/or all Addenda as may be issued for this project. Failure to obtain and acknowledge any and/or Addenda will result in rejection of Contractor's bid. The work consists of doing everything required to be performed and providing and furnishing all of the labor, power, materials as described in the Specifications and Drawings, necessary tools and equipment, Workman's Compensation and Property Damage and Public Liability Insurance, superintendence and all utility and transportation services required to complete in a workmanlike manner all the work required. The work required under this contract is located upon sites owned by the Owner and/or rights-of-way obtained by the Owner. The bidder shall base his bid upon his personal information on soils, soil conditions, roadways and working areas, facilities for receiving, transporting, handling, storing and placing materials and equipment and shall base his bid upon his personal knowledge of environment and physical conditions which he may encounter during construction. This personal knowledge must be obtained by the bidder from his own detailed inspection of the proposed construction site together with information such as he shall personally acquire or obtain from his own observations and investigations. The Owner and the Owner's Engineer shall have no financial or other responsibility for soil conditions which may be encountered by the bidder and/or contractor because of soil, physical or environmental conditions or circumstances.

Award

Sidewalks / Parking Lot

$31,760.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
310
Active Projects
124
Bidding Soon
2,536
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 26, 2025

March 28, 2025

Project location map

E 1st St, Morrice, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.