BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 18, 2025 at 8:00 PM

Updated March 19, 2025

Site work, new construction and renovation of a civil project in Houston, Texas. Completed plans call for the construction of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

The deadline to ask questions is 2/17/2025 10:00 AM CST Construction of Water Plant No. 2 Rehabilitation Phase 2 for Fallbrook UD, Harris County, Texas Scope of Project: The rehabilitation of Fallbrook Water Plant No. 2 Phase II shall include but not be limited to the demolition of existing concrete generator pad; construction of a concrete masonry units (CMU) building for electrical controls; removal and replacement of MCC lineup into new building; removal and replacement of well equipment, conduit, junction boxes, surge protection devices, mounting posts, ground well, and installation of vibration switch; electrical connection for surface water meter station; installation of instrumentation equipment, pressure transmitters; and installation of chlorine feed equipment, LAS feed equipment and orthophosphate feed system including one (1) 120 gallons double walled orthophosphate tank and chemical analyzers. This project also includes the electrical upgrades for Water Plant No. 1. A Bidder submitting Electronic Bids must submit its Bid and bid securities in compliance with Owner's Order Adopting Section 49.2731 Electronic Bidding Rules and all Bids and bid securities must be submitted through online. A cashier's check or bid bond in the amount of 5% of the total bid amount must accompany each bid. The successful bidder will be required to provide performance, payment and maintenance bonds for the full amount of the contract. The Owner reserves the right to reject any or all bids. Contractor is required to submit TEC Form 1295 (Certificate of Interested Parties) with their bid. If plans, specifications and bid documents are not initially available for download, they will be available for review at the office of the Engineer. The Front Office and Receptionist Desk are located on the 5th floor (Suite 500).

Bid Results

Water / Sewer

$1,233,469.00

Public - County

New Construction, Renovation, Site Work

37

21

6

Subscribe For Documents

73 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
7
Bidding Soon
2,406
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.