BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2025 at 7:00 PM

Updated February 27, 2025

Site work and paving for a mixed-use development in Sioux Falls, South Dakota. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of February 20, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Bids will be presented to the School Board at the next succeeding regular Board meeting, all in accordance with Board policy. All bids shall be made in accordance with forms and specifications attached to and made a part of the proposed contract documents. Each bid for which the aggregate amount for all items bid exceeds $25,000, must contain a certified check, cashier's check or draft for 5% of the amount of the bid, (including ''add alternates''), such check or draft to be certified or issued by either a state or national bank and payable to the School District; or in lieu thereof, a bid bond for ten percent (10%) of the amount of the bid (including ''add alternates''); such bond to be issued by a surety authorized to do business in this state and payable to the School District. The certified check, cashier's check, draft or bid bond guarantees the execution of a contract and shall be held by the School District until the contract is executed. Faxed or emailed bid security will not be accepted (SDCL 5-18B-2 and 13-20-7). The successful bidder shall be required to furnish a Contract Performance Bond and a Labor and Materials Payment Bond in the penal amount of one hundred percent (100%) of the contract price in a form approved by the School District, dated and executed the same date as the contract documents to comply with statutory requirements, in accordance with SDCL 5-18B-4. The School Board reserves the right to reject any and all bids or parts thereof, and to waive any irregularities. Grading, asphalt removal, cold milling asphalt, sidewalk repair, curb & gutter repair, subgrade cement stabilization, concrete curb & gutter, aggregate base course, asphalt concrete surfacing and pavement markings for the Oscar Howe Elementary School playground and for the Discovery Elementary School parking lot and playground in Sioux Falls, South Dakota.

Award

Playgrounds / Parks / Athletic Fields

$346,490.00

Public - City

Paving, Site Work

21

10

6

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
41
Bidding Soon
470
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 14, 2025

May 27, 2025

Project location map

Multiple Locations, Sioux Falls, SD

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.