Site work for a water / sewer project in Washington, New Jersey. Completed plans call for site work for a water / sewer project.

As of 3/5/25, this project has not yet been awarded. The project is expected to be awarded 3/31/25. Disclaimer: IN ORDER FOR YOUR BID TO BE CONSIDERED A LEGAL BONAFIDE BIDDER ON THE PROJECT, DOCUMENTS MUST BE PURCHASED FROM REMINGTON, VERNICK ENGINEERS DIRECTLY 2025 Lead Service Line Replacement Each bid shall be accompanied by a certified check, cashier's check or bid bond duly executed by the bidder as principal and having as surety thereon a surety company approved by the WTMUA in an amount not less than ten percent (10%) but in no case in excess of $20,000.00 of the amount bid. Any such bid bond shall be without endorsement or conditions. Bid shall also be accompanied by a certificate letter from a surety company stating that it will provide the bidder with the completion bond. The WTMUA reserves the right to consider the bids for sixty (60) days after the receipt thereof, and further reserves the right to reject any or all bids, either in whole or in part and also to waive any informality in any and make such awards or take action as may be in the best interest of the WTMUA, in accordance with applicable law. Bids must be on the bid form prepared by Remington & Vernick Engineers, in the manner designated therein and required by the specifications, must be enclosed in sealed envelopes bearing the name and address of the bidder on the outside and also bearing on the outside reference to the particular work bid upon. The award of the contract shall be made subject to the necessary moneys to do the work being provided by the WTMUA in a lawful manner. The contract to be executed by the successful bidder will provide that it shall not become effective until the necessary moneys to do the work have been provided by the WTMUA in a lawful manner. The award shall further be subjected to the securing of necessary State, Federal or Local permits governing the work. Bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq., N.J.A.C. 17:27 (Affirmative Action), N.J.S.A. 34:11-56.25 et seq.(New Jersey Prevailing Wage Act), and Americans with Disabilities Act of 1990 (42 U.S.C. S12101, et seq.). The contractor is further notified that he must comply with N.J.S.A. 52:25-24.2 and submit a Disclosure Statement listing stockholders with his bid. The contractor is further notified that he must comply with N.J.S.A. 34:11-56.48 et seq. Public Works Contractor Registration Act and he and any subcontractors must be registered in accordance with the act. The contractor is also further notified that he must comply with N.J.S.A. 52:32-44 and submit proof of business registration and submit proof of business registration for any named subcontractors in accordance with the act. Every request for such interpretation should be made in writing, addressed to the Engineer, and to be given consideration, must be received at least ten (10) days prior to the final date fixed for receiving bids *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Bid Results

Water / Sewer

$110,212.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

33

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Quality Assurance, Manufacturer Qualifications, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Retaining Walls, Planting, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
490
Active Projects
314
Bidding Soon
4,931
All Active Projects
2,103
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2025

March 21, 2025

img_map_placeholder

Multiple Locations, Washington, NJ

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2025 Washington Township Municipal Utilities Authority Lead Service Line Replacements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.