Renovation of a library in Fulton, Missouri. Completed plans call for the renovation of a library.
mechanical engineering firms to assess HVAC; recommend replacement; prepare plans/specs to bid new system; inspect/ accept winning contractor's installation at Callaway County Public Library, 710 Court St, Fulton. The Daniel Boone Regional Library (DBRL) is seeking proposals from qualified mechanical engineering firms to (1) assess the existing HVAC system; (2) recommend HVAC replacement with cost estimates; (3) prepare plans and specifications to bid for the replacement of our existing HVAC system; (4) inspect and accept the successful contractor's installed equipment at the Callaway County Public Library (CCPL). I. The selected firm shall provide a report for DBRL with recommendations for replacing the three HVAC CCPL systems with a single HVAC system that adequately heats and cools the building. A. The system should have a temperature control system that allows operation, scheduling, and control of spaces or zones. The HVAC system needs to provide energy efficiently and allow for remote access control. B. The required system report will need to include cost estimates for the proposed options. II. The selected firm will be required to design and prepare bid documents for the approved design option by DBRL that meets the heating and cooling requirements of the Callaway County Public Library. The design includes a temperature control system that allows operation, scheduling, and control of spaces or zones. HVAC needs to: A. Provide a detailed timeline for project completion, including milestones and deadlines. B. Issue bid document for a contractor. C. Present the contractor's proposals responses to the DBRL Board of Trustees and make a recommendation on best bid proposal. D. Notify all bid responders of DBRL's selection of a successful bidder. E. Assist DBRL staff with preparing and executing a contract with the successful bidder. F. Evaluate the contractor's work and compliance with the contract and bid documents. G. Review all contractor invoices and certify as accurate to DBRL staff including inspection of the installation and final approval and acceptance of the installed equipment. H. Include a comprehensive maintenance plan for the new HVAC system. I. Work with DBRL staff to ensure all laws and regulations are complied with when bidding for the new HVAC System such as prevailing wage, Domestic Content, e-verify requirements, etc.. Inquiries or questions about the Bid or Specifications may be directed to Russ Niermeyer, Building and Grounds Manager, Daniel Boone Regional Library, 573-817-7024. All questions or requests shall be submitted in writing by electronic mail, letter, or fax, no later than two days prior to the bid closing, Monday, March 17, 2025. Replies may be issued by Addendum.
Post-Bid
Library
$100,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 21, 2025
April 21, 2025
710 Court St, Fulton, MO
Related To This Project
Fulton, MO
Bid Date: Mar 19 2025
Fulton, MO
Bid Date: Mar 07 2025
Fulton, MO
Bid Date: Mar 18 2025
Fulton, MO
Bid Date: Mar 11 2025
Fulton, MO
Bid Date: Mar 11 2025
Fulton, MO
Bid Date: Mar 11 2025
Fulton, MO
Bid Date: Mar 11 2025
Fulton, MO
Bid Date: Apr 24 2025
Fulton, MO
Bid Date: Jan 06 2025
Fulton, MO
Bid Date: Dec 30 2024
Fulton, MO
Bid Date: Dec 03 2024
Fulton, MO
Bid Date: Nov 19 2024
Fulton, MO
Bid Date: Nov 12 2024
Fulton, MO
Bid Date: Nov 15 2024
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.