BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 26, 2025 at 8:00 PM

Updated March 27, 2025

Site work and paving for a mixed-use development in Fulton, Missouri. Completed plans call for site work for a transportation facility; for paving for a transportation facility; and water / sewer project.

Contract Work Items. This project will involve the following work items and estimated quantities. Prospective bidders are hereby advised that the quantities indicated herein are approximate and are subject to change. 1 C-105-6.1 Mobilization (10% Limit) LS 1 2 P-101-5.1 Concrete Crack Sealing LF 1,200 3 P-605-5.1 PCC Joint Resealing LF 48,500 4 P-605-5.2 PCC Isolation Joint Resealing LF 400 5 P-620-5.1 White Runway Markings, with Reflective Media SF 46,000 6 P-620-5.2 Yellow Taxiway Markings, with Reflective Media SF 3,700 7 P-620-5.3 Black Markings, Without Reflective Media SF 17,000 8 P-620-5.4 Pavement Marking Removal SF 67,000 9 D-701-5.1 Pipe Removal LF 400 10 D-701-5.2 Reset 24" RCP FES EA 1 11 SP-1-5.1 PCC Spall Repair SF 50 12 SP-1-5.2 PCC Full-Depth Patching SY 90.0 13 P-605-5.1 PCC Joint Resealing LF 12,600 14 P-605-5.2 PCC Isolation Joint Resealing LF 400 15 D-754-5.1 Concrete Paved Ditch Liner - 4' Wide LS 1 Questions regarding bids shall be directed in writing to Luke Steagall, Project Engineer, at Crawford, Murphy & Tilly, Inc. by e-mail at lsteagall@cmtengr.com. Question Deadline 03/13/2025 at 5:00 PM CT Contract Time. The Owner has established a contract performance time of forty four (44) calendar days for the Base Bid and fifty (50) calendar days if Additive Alternate No. 1 is awarded from the date of the Notice-to-Proceed. All project work shall be substantially completed within the stated timeframe. This project is subject to liquidated damages as prescribed in the project manual. Bid Security. No bid will be considered unless accompanied by a certified check or cashier's check on any bank or trust company insured by the Federal Deposit Insurance Corporation, payable to City of Fulton, MO, for not less than five (5) percent of the total amount of the bid, or by a bid bond secured by an approved surety or sureties, payable to the Owner, for not less than five (5) percent of the total amount of the bid. Bonding Requirements. The successful bidder will be required to furnish separate performance and payment bonds each in an amount equal to 100% of the contract price at the time of contract execution.

Bid Results

Transportation Terminals

$579,890.00

Public - City

Paving, Site Work

39

7

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
24
Bidding Soon
614
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2025

April 17, 2025

Project location map

4420 Co Rte 304, Fulton, MO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.