BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 27, 2025 at 8:00 PM

Updated May 22, 2025

Site work and paving for a road / highway in Fulton, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Please indicate the bid number on the outside of the envelope. The Callaway County Commission reserves the right to accept or reject any or all bids All questions concerning the bid document preparation or project specific questions shall be directed to the Road and Bridge Department Administrator, H. David Thomas, PE (Engineer of Record) at 573-642-0740; dthomas@callawaycounty.org . Questions that require clarifications or modification of the bid documents will not be answered unless there is adequate time to issue an addendum The Owner reserves the right to adjust the amount of work within the contract (both for the Base Bid and Alternate No. 1) to meet match the approved budget for the project of $710,000 based on the bid prices. The Bidder shall provide unit prices for the bid items for the Base Bid and Alternate No. 1 based on the estimated quantities provided. This project includes the following work in the Base Bid; paving the remainder of CR 401 from the existing pavement to the intersection with CR 404, paving the portion of CR 404 from the exiting paved section just west of the CR 404/405 intersection to approximately 100' west of the CR 401/404 intersection. This project includes the following work in the Alternate No. 1; continuing the paving of CR 404 from the termination of the work in the base bid to approximately 100' west of the bridge on CR 404 that lies just west of the CR404/403 intersection and paving the portion of CR 403 from the intersection with CR 404 to 100' south of the bridge on CR 403 that lies just south of the CR404/403 intersection. The pavement section for all work shall be a 4 inch thick MODOT Type 1 base layer (22 foot wide) with a 5 inch asphalt section (2" BP-1, 3" BB, and 20 foot wide). The total calculated length of mainline paving for the Base Bid is 6,995 LF and the total calculated length of mainline paving for Alternate No. 1 is 1,191 LF.

Post-Bid

Roads / Highways

$710,000.00

Public - County

Paving, Site Work

6

5

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
36
Bidding Soon
607
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2025

June 20, 2025

Project location map

To Be Determined, Fulton, MO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.