Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 18, 2025 at 7:00 PM
Updated April 11, 2025
Demolition, site work, remodeling and addition to an educational facility in Salem, Utah. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the remodel of a educational facility; and for site work for a educational facility.
Nebo School District (the School District) is accepting Statements of Qualifications (SOQ) from qualified and licensed General Contractors (the General Contractors) for the addition and remodel of two athletic fieldhouses located at Maple Mountain High School, located in Spanish Fork, Utah and at Salem Hills High School, located in Salem, Utah (the Project). The Maple Mountain High School Fieldhouse Addition and Remodel project consists of alterations to the existing fieldhouse at MMHS. The approximately 20,000 addition and remodel includes new restrooms, sports court, new turf, new metal building skin, masonry wainscot and new windows. Site work will consist of rerouting some utilities, patching and repair of parking lots, driveways, concrete walks and landscaping. The Salem Hills High School Fieldhouse consists of the construction of a new approximately 34,000 sq. ft. athletic facility constructed with a metal building and wood interior framing of three classrooms and restrooms. The building will have a sports court and artificial turf area with sports netting. Site work will include patching and repair of parking lots, driveways, concrete walks and landscaping. The estimated cost of this Project is around twelve million General Contractors submitting a SOQ are cautioned not to contact members of the Evaluation Committee, the Board of Education, or District Administration personnel, other than the designated contact person designated below, throughout the RFSOQ process as of the date hereof. Failure to comply with this requirement may result in disqualification from consideration. Contact for RFSOQ Clarifications: Ryan Pitcher, District Chief Procurement Officer Nebo School District 350 South Main Spanish Fork, Utah 84660 Telephone No. 801-354-7433 Email: ryan.pitcher@nebo.edu Nebo School District reserves the right to reject any or all SOQ submittals, or to waive any formality or technicality in any SOQ submittal, in the best interests of the School District.
Post-Bid
Educational
$12,000,000.00
Public - County
Addition, Demolition, Remodeling, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 17, 2025
April 17, 2025
Multiple Locations, Salem, UT
Related To This Project
Salem, UT
--
Salem, UT
Bid Date: Mar 21 2025
Salem, UT
Bid Date: Mar 20 2025
Salem, UT
Bid Date: May 22 2025
Salem, UT
Bid Date: Jun 06 2025
Salem, UT
Bid Date: Dec 16 2020
Salem, UT
Bid Date: Jul 30 2025
Salem, UT
--
Salem, UT
Bid Date: Dec 12 2024
Salem, UT
Bid Date: Nov 21 2024
Salem, UT
Bid Date: Jun 04 2024
Salem, UT
Bid Date: Apr 24 2024
Unlock Your Potential with Access to Commercial Construction Data
Sign up now to get free company and project data. No payment required.
