BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 2, 2025 at 7:00 PM

Updated March 3, 2025

Site work, paving and outdoor lighting for a mixed-use development in Lake Zurich, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a road / highway.

The Village of Lake Zurich is requesting bids from qualified firms and/or individuals to perform utility and roadway streetscape work. A summary of major work items is described below: 1. Main Street Beautification utility work consists of the following: 180' of 12" C900 water main installation, lead service line replacements, sanitary sewer manhole replacements, sanitary sewer lining, sanitary sewer service replacements, storm sewer and structure installation, and underdrain installation. 2. Main Street Beautification road work consists of the following: Pavement removal, milling, curb removal, sidewalk removal, street lighting, concrete curb, barrier curb planters, concrete base, concrete sidewalk, brick paver walkways and crosswalks, decorative brick intersection emblem, decorative landscaping, bioswales, and sodding. 3. Whitney Road Utility Replacement work consists of the following: 1,380' of 8" PVC C900 watermain, 1,660' of 10" PVC C900 watermain, valve vaults, hydrants, water services, 2,760' of 8" sanitary sewer removal and replacement, Sanitary sewer manhole removal and replacements, 6" Sanitary Services with cleanouts, curb and sidewalk removal and replacement, and roadway reconstruction. The Village of Lake Zurich reserves the right to reject any or all proposals, or parts thereof, and to waive any technicality, informality or irregularity in the proposals received, and to disregard all nonconforming or conditional proposals or counterproposals and to hold the proposal for sixty (60) days from the opening date set forth above. The Village further reserves the right in its sole discretion to award the proposal to the most responsible bidder whose offer best responds in quality, fitness and capacity to the requirements of the proposed work or usage and therefore is in the best interest of the Village. Est. Completion Date: Nov. 28, 2025 Pre-Qualification: Yes Question Deadline 02/19/2025 at 12:00 PM CT All questions about the meaning or intent of the Contract Documents shall be submitted to the Engineer in writing

Post-Bid

Roads / Highways

$900,000.00

Public - City

Outdoor Lighting, Paving, Site Work

112

14

24

6

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
541
Active Projects
293
Bidding Soon
3,864
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2025

March 31, 2025

Project location map

Multiple Locations, Lake Zurich, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.