BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 4, 2026 at 8:00 PM

Updated April 5, 2026

Site work and paving for a civil project in Lemoore, California. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.

06-Fre,Kin-41-R48.0/R48.3, R0.0/R7.1 In Kings and Fresno Counties Near Lemoore From 0.3 Mile South of Excelsior Avenue to 1.0 Mile South of Conejo Avenue The Contractor Must Have Either a Class a License or the Following Class C License Which Constitutes a Majority of the Work: C-12 585 Working Days CADOT - JPCP, HMA, Aggregate Base, Earthwork and Bridge At 06-Fre,Kin-41-R48.0/R48.3, R0.0/R7.1 The Project is located on State Route (SR) 41 between highway post mile (PM) 0.63 and PM 3.95, from 0.4 miles south of the intersection of West Laguna Avenue to 2.2 miles south of the intersection of East Elkhorn Avenue, in Fresno County, California. The Project involves work at four streams that cross SR 41, located at PM 0.63 (Laguna Ditch [also called G Canal]), PM 2.19 (Camden Ditch), PM 3.15 (Big B Ditch), and PM 3.95 (Murphy Slough) (Figures 1 and 2 and Table 1). The four locations are collectively referred to as the Project Area, and individually referred to as Project work areas. The Project involves activities related to the removal and replacement of existing culvert structures on SR 41 at Laguna Ditch, Camden Ditch, and Big B Ditch and construction of a new single-span, concrete, two-lane bridge over Murphy Slough. The Project is part of a larger transportation project in which Caltrans will convert the existing two-lane expressway into a four-lane expressway. Existing non-native, weedy herbaceous vegetation will be cleared from Project work areas and hauled away. No trees over 4 inches diameter at breast height will be removed. A California native seed mix will be applied once all culvert/bridge construction activities have ended. The Project will take approximately 300 working days and 140 nights of work. Work within the streams will occur while the streams are naturally dry. Water diversion will not be required

Award

Roads / Highways

$54,562,400.00

Public - State/Provincial

Paving, Site Work

390

20

38

7

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
2
Bidding Soon
411
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2026

April 13, 2026

Project location map

CA-41, Lemoore, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.