EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 10, 2025 at 8:00 PM

Updated October 1, 2024

Site work and outdoor lighting for a road / highway in Denver, Colorado. Completed plans call for site work for a road / highway; and for outdoor lighting for a road / highway.

Connector Road #2 - Streetlights This Contract provides for the construction of the following: Approximately 1 mile of roadway streetlighting. The project includes about 1.7 miles of conduit, 9 pedestrian lights, and 42 street lights. Of the 42 street lights 38 of them have already been ordered and this project only includes the installation. The remaining 4 streetlights are to be procured and installed as part of this project. The project is located east of Denali Boulevard and west of Harvest Road between E. 52nd Ave and E. 48th Ave. Bidders must be licensed Contractors in the State of Colorado. Bids will be received providing unit price for items; however, the price given will be on a maximum not-to-exceed amount, as described in the Bidding Documents. The Work is expected to be commenced within Sixty (60) days after the Date of Contract. Bid Security in the amount of five percent (5%) of the total Bid Price must accompany each Bid in the form specified in the Instructions to Bidders. The Successful Bidder will be required to furnish a Performance Bond, Labor and Material Payment Bond guaranteeing faithful performance and warranty bond for two-years after Substantial Completion, and the payment of all bills and obligations arising from the performance of the Contract. The OWNER reserves the right to award the contract by sections, to reject any or all Bids, and to waive any informalities and irregularities therein. For further information, please contact Barney Fix at Merrick & Company at 303-751-0741. All questions about the meaning or intent of the Bidding Documents are to be directed to ENGINEER. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda. Questionsreceived less than eight (8) days prior to the date for opening of the Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. WORK INCLUDED A. This Contract providesfor the construction of the following: 1. Summary of Work. The work to be performed under this Contract consists of includes Approximately 1 mile of roadway streetlighting. The project includes about 1.7 miles of conduit, 9 pedestrian lights, and 42 streetlights. Of the 42 streetlights 38 of them have already been ordered and this project only includes the installation. The remaining 4 streetlights are to be procured and installed as part of this project. The project is located east of Denali Boulevard and west of Harvest Road between E. 52nd Ave and E. 48th Ave. All work shall be done in accordance with the Standard Technical Specifications of the City of Aurora Standards and Specifications. The Special Provisions of this Contract, and as shown on the Construction Drawings and Specifications prepared by Westwood Professional Services, Inc., consulting engineers. 2. Work includes cooperating with the Authority and other contractors engaged by the Authority for performance of associated work. 3. Refer to the SPECIAL PROVISIONS for additional notes regarding scope of work.

Post-Bid

Roads / Highways

$300,000.00

Public - City

Outdoor Lighting, Site Work

16

12

2

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
58
Bidding Soon
905
All Active Projects
452
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2025

April 7, 2025

img_map_placeholder

E 52nd Ave & E 48th Ave, Denver, CO

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Connector Roads #2 - Streetlights

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.