BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 21, 2025 at 7:00 PM

Updated February 22, 2025

Site work for a water / sewer project in Waterford, Michigan. Completed plans call for site work for a water / sewer project.

Reference Number 0000375150 Ribbon Cutting is scheduled for Saturday, June 28, 2025 at 11:00 am. All work must be completed by this date. The two planting areas are at the south end of Kohler St. and Briggs St. in Waterford Township, off of Crescent Lake Rd. near Tubbs Rd. These planted areas are the final step in construction of the Riverwalk from Crescent Lake Rd. to the Drayton Plains Nature Center. The completion date of the construction project was originally 5/20/25 giving us a full month to plant the green barrier before the Ribbon Cutting. Delays on the delivery of a bridge have pushed this date to an estimated completion date of 6/20/25 leaving only one week to accomplish the planting and mulching. There is a possibility of an earlier completion of construction. Question Acceptance Deadline 02/13/2025 05:00 PM EST Questions are submitted online No If you would like to meet on-site or have questions, please contact: Sue Camilleri at 248-420-7735 Each RFP shall be accompanied by a RFP security in the amount of five percent of the RFP amount subject to the conditions in the Information to vendors. A vendor will be permitted to withdraw their RFP unopened after it has been deposited, if such request is received prior to the time specified for opening RFPs and provided that their identity is made known and the responsible party signs for the RFP. No RFP shall be withdrawn after the opening of the RFPs without the consent of the Township for a minimum of one hundred twenty days (120) from the scheduled time for closing RFPs. The Township reserves the right: to accept any or all alternative RFPs; to award the Contract to other than the lowest vendor; to waive any irregularities of informalities, or both; to reject any or all RFPs; and in general to make the award of the Contract in any manner deemed by the Township, in its sole discretion, to be in the best interest of the Township. Conditional RFPs will not be considered.

Post-Bid

Water / Sewer

$200,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
113
Active Projects
17
Bidding Soon
2,025
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2025

March 24, 2025

Project location map

Multiple Locations, Waterford, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.