BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 4, 2025 at 7:00 PM

Updated March 5, 2025

Site work and new construction of a pre-engineered storage facility in Arvada, Colorado. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Reference Number 0000375187 Bid Intent Not Available Job Location: 25030 Highway 72, Arvada, Colorado Estimated Contract Cost: $2,250,000.00 Qualified contractors are invited to bid on the construction of the new 4+1 Bay Vehicle Storage Facility (VSF) at an existing CDOT maintenance yard in Arvada. The new VSF shall be a 4,840 square foot pre-engineered metal building (PEMB). The VSF will contain an administration area (840 sf) and four 20'-0" x 50'-0" bays used to store CDOT plow trucks, two of which shall be wash bays with waterproofed finishes and fixtures. The flooring shall be concrete slab-on-grade with a 20-foot concrete apron at the overhead doors. The project will also include site utility connections, as well as civil work such as grading, paving, concrete flatwork, site work, and a concrete sand filter with under-drain for storm water management. The site is served by the following utility providers: natural gas is provided by XCEL. Electric power is provided by United Power. A new water well has been drilled in the NW corner of the property, awaiting connection to the new building under this contract. (The existing VSF is on a separate well, which will be decommissioned when the VSF is demolished by CDOT under a separate contract.) All piping from the new well, storage tank, fittings, connections, pumps and wiring required for the water system is included in this contract. For sanitary sewer, a new connection to City of Arvada sewer system will be made as part of this contract. Anticipated Notice to Proceed 03/28/2025 Anticipated Substantial Completion (270 days) 12/23/2025 Anticipated Final Acceptance (44 days) 02/05/2025 Question Deadline 02/18/2025 at 12:00 PM MT Questions are submitted online No, Point of Contact/Clarification Name: Robert L. Wilson Agency: Colorado Department of Transportation (CDOT) Phone: 303-548-6819 Email: Robert.L.Wilson@state.co.us Buyer Preferences, Guidelines & Requirements General Requirements - Prevailing Wage Required Bonding Requirements - Bid Bond 5 % CDOT reserves the right to waive informalities or irregularities and to reject any and all Bids. site on google maps, use: 3952'41.5"N 10516'56.2"W *Owen-Ames-Kimball request bids by 2/24/25 at 3:00 PM. **McCauley Construction request bids by 2/24/25. ***Novus Construction request bids by 2/25/25.

Bid Results

Warehouse / Distribution - Pre-Engineered Storage Building

$1,734,448.00

Public - State/Provincial

New Construction, Site Work

69

30

10

4

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
103
Bidding Soon
1,363
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2025

March 28, 2025

Project location map

25030 W 72nd Dr, Arvada, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.