Published February 4, 2025 at 7:00 PM
Updated February 5, 2025
This is a service / maintenance or supply contract in Peru, Illinois. Contact the soliciting agency for additional information.
This project requires 23% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on April 24, 2025, at 9:30 AM at the Region Two/District Three Office in Ottawa. Phase I/II engineering services are required for the preparation of a Combined Design Report (anticipated to be a Categorical Exclusion) and final contract plans, specifications, and estimates for reconstruction of the I-80 interchange with Illinois 251 at Peru. The project will evaluate improvements to I-80 from the Little Vermilion river to just east of Plank Road, IL 251 from south of 31st Road to 38th Street, and the portion of May Road and Charles Street that are unmarked state routes. Phase I work is anticipated to include preparation of a Combined Design Report, Access Justification Report, Interchange Type Study, and Interchange Design Study for reconstruction of the Interchange. Intersection Design Studies are anticipated for Unytite Drive, LaSalle Rd/May Rd and 38th Street intersections with IL 251. Preparation of Bridge Condition Reports, Type, Size and Location Studies, Roadway and Structure Geotechnical Reports may be required. Work will include conducting route surveys, proposed design, crash analysis, review of geometry, maintenance of traffic, identification of safety improvements, review of bicycle and pedestrian accommodations, interchange lighting design, and drainage design. Preparing exhibits for public involvement and coordination with other agencies may be required. An in person and/or virtual public meeting is anticipated. Utility conflicts and relocations, queue and delay analysis, cost estimates, preparing plan and profile and cross section sheets, a preliminary transportation management plan, and preparation of a drainage study will be needed. A noise study may be required along with all other work necessary to complete the Combined Design Report. Phase II engineering services will include preparation of Phase II final contract plans and special provisions. Work may include preparing roadway plans, preparing structure plans, preparing lighting and traffic signal plans, identifying utility conflicts and relocations, preparing detailed staging and traffic control plans, participating in local agency and/or public coordination, reviewing shop drawings, providing quantities and detailed information to the district Estimator, and all other work necessary to complete the final contract Plans, Specifications, and Estimates. Phase II work will be included in a planned supplement. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The completion date for this contract will be 72 months after authorization to proceed. The Phase I portion is expected to be completed in 42 months and the Phase II portion is expected to be completed in 30 months. A planned Supplement for Phase II will be done near the completion of Phase I. The Prime firm must be prequalified in the following categories to be considered for this project: Highways (Freeways) Location Design Studies (Reconstruction/Major Rehabilitation) Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The method of contractor selection has not been determined at this time. ILDOT - 30 - RFP - I-80 and Illinois 251 interchange at Peru, Phase I/II Project
Conceptual
Roads / Highways
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 20, 2025
I-80 & IL-251, Peru, IL
Related To This Project
Peru, IL
Bid Date: Mar 07 2025
Peru, IL
Bid Date: Feb 19 2025
Peru, IL
Bid Date: Mar 19 2025
Peru, IL
--
Peru, IL
Bid Date: Mar 20 2025
Peru, IL
Bid Date: May 27 2025
Peru, IL
Bid Date: Jun 03 2025
Peru, IL
Bid Date: Jun 11 2025
Peru, IL
Bid Date: Feb 27 2026
Peru, IL
Bid Date: Mar 07 2025
Peru, IL
Bid Date: Mar 07 2025
Peru, IL
Bid Date: Jan 09 2025
Peru, IL
Bid Date: Nov 06 2024
Peru, IL
Bid Date: Oct 24 2024
Peru, IL
Bid Date: Oct 24 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.