BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2025 at 7:00 PM

Updated February 5, 2025

This is a service / maintenance or supply contract in Elmhurst, Illinois. Contact the soliciting agency for additional information.

This project may contain Federal Funds. This project requires 27% DBE participation, or if the contract goal is not met, documented evidence of good faith efforts. The Complexity Factor for this project is 0. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on April 25, 2025, at 11:00 AM at the Region One/District One Office in Schaumburg. Phase III engineering services are required to provide construction engineering for subject improvement. Work includes, but is not limited to, replacing the bridge that carries Central Park Ave over I-290. The existing structure (S.N. 016-2072) is a three (3) span continuous noncomposite steel wide flange bridge with zero skew and an overall width of 61'-0" and length backto-back abutments of 204'-0". The roadway width is 44'-0" with two raised 8'-6" wide (7'-6" clear) sidewalks on each side. The existing structure will be replaced with a new continuous galvanized steel structure supported on semi-integral abutments. The bridge spans will be lengthened 20' on both ends and will be 61' wide. The intersection of Harrison and Congress parkway will be resurfaced and will include ADA improvements and pavement markings. The project will also include all incidental and collateral work necessary to complete the project as shown on the plans and described herein. Traffic will be detoured during construction. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The Prime firm must be prequalified in the Special Services (Construction Inspection) category to be considered for this project. The anticipated construction completion date is October 30, 2026. Statements of Interest, including resumes of only the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS).. The method of contractor selection has not been determined at this time. ILDOT - 15 - RFP - I-290 at Central Park Ave, Phase III Project

Conceptual

Bridges / Tunnels

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
456
Active Projects
246
Bidding Soon
3,367
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2025

Project location map

I-290, Elmhurst, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.