Published February 4, 2025 at 7:00 PM
Updated February 5, 2025
Renovation of a mixed-use development in Smithfield, Rhode Island. Conceptual plans call for the renovation of a municipal facility; and parking garage.
The current public works facility was built around 1955. In March of 2019, the Department of Public Works contracted with Aharonian and Associates, Inc. of Smithfield, RI, to complete an assessment and Feasibility Study of the existing main garage at 3 Spragueville Road. The intent of this feasibility study was to evaluate the condition of the existing building and determine whether the existing structure can be utilized to provide the Town of Smithfield with a safe and cohesive space for staff, administration and the public. The goal is to make a safe working environment for the staff and visiting public, utilizing facilities such as recycling and administrative inquiries, while separating the Public Works daily operations and maintenance activities, providing a safer work site. There were a number of design and operational deficiencies identified during the study. The existing facility has inadequate ventilation, causing fumes and odors from the vehicle maintenance bays to permeate throughout the building during the day. The building currently does not meet ADA requirements. The maintenance staff does not have access to any vehicle lifts, making routine maintenance more time consuming and dangerous. The existing concrete floor in the work bays are spalling badly and eroding from years of exposure to the salt and sand coming off the vehicles. There exists no clear separation between public access and operations space, allowing for potentially dangerous encounters between the visiting public and department vehicles and heavy machinery. An RFQ was advertised and awarded to Aharonian and Associates to design three phases of construction. Phase I design is completed and ready to be advertised for construction. Phase II design was awarded in 2021 and is at 80% design now pending construction of Phase I. Phase III funds were approved in the 2022 budget and will begin after Phase II design is complete. Phase I design addresses the deficiencies in the fleet maintenance area of the building by adding an additional 20' x 75' bay with a higher ceiling so lifts can be used to work under the larger vehicles. The new bay will also handle the Fire Department vehicles which will increase the savings to the town. Phase II addresses the crews work area and upgrades to current code and Phase III will address the administrative issues. **Alternate Request - The intent of this request comes from the operational audit which considers merging the Recreation Department with the DPW. This would require the expansion of the DPW facilities. This alternative would provide one 75' x 100' heated steel building that would provide the storage needed for all seasons along with the relocation of the fleet maintenance operations to the new building. This would negate the need for the addition onto the existing garage, which is requiring additional upgrades due to current codes. As of February 04, 2025, This project is included in the city's 2025-2029 Capital Improvement Program (CIP) *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Municipal
$1,600,000.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 2, 2026
3 Spragueville Rd, Smithfield, RI
Related To This Project
Smithfield, RI
--
Smithfield, RI
--
Smithfield, RI
Bid Date: Apr 04 2025
Smithfield, RI
Bid Date: Mar 27 2025
Smithfield, RI
Bid Date: May 08 2025
Smithfield, RI
Bid Date: May 27 2025
Smithfield, RI
Bid Date: Feb 17 2026
Smithfield, RI
Bid Date: Jul 30 2025
Smithfield, RI
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.