BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 3, 2025 at 7:00 PM

Updated December 4, 2025

Site work and paving for a mixed-use development in Odessa, Missouri. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; road / highway; and road / highway.

The proposed work includes: Construction of ADA compliant Sidewalk, Ramps, & Street Improvements. Contractor RFIs i. Any additional questions past the pre-bid meeting must be submitted by email to Mitch Gibler (OWN) at mgibler@weareown.com by Monday December 8, 2025, at 2:00 PM ii. We have received several questions from contractors, we are compiling into a document and will post all questions with answers to Drexel Technologies Plan Room no later than Thursday December 11, 2025 iii. If any questions result in an Addendum, the Addendum will be posted no later than 7 days prior to the bid opening (Thursday December 11, 2025) at 2:00 PM Project TAP-9901(440) may be bid as an individual project or as a package bundle with TAP-9901(443). The Contract, if awarded, will be awarded to the lowest responsive, responsible bidder or bidders - complying with the Conditions of the Contract Documents within the Owner's budget - whose combined contract TAP-9901(440) and TAP-9901(443) amount provides the lowest overall price. Contractors and sub-contractors who sign a contract to work on public works project provide a 10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. A certified or cashier's check or a bid bond in the amount of 5% shall be submitted with each proposal. The City of Odessa, Missouri reserves the right to waive any informalities or minor defects or to reject any or all bids and to re-advertise and to rebid. All materials for the project shall be tax exempt. The DBE Goal for this project is 0%. MO DOT - Odessa 2nd Street Sidewalk, Ramps & Street Improvements Phases I &II PROPOSED WORK: The proposed work, hereinafter called the work, includes: This project is located in Odessa, Missouri on 2nd Street from Main Street to Dryden Street. The project will consist of the installation of new concrete sidewalk, concrete curb and gutter, ADA compliant sidewalk ramps, street improvements, and electrical improvements along both east and west sides of 2nd Street.

GC Bidding

Sidewalks / Parking Lot

$400,000.00

Public - City

Paving, Site Work

85

13

10

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
85
Bidding Soon
1,049
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2025

January 1, 2026

Project location map

Second St, Odessa, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.