BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 13, 2025 at 8:00 PM

Updated October 14, 2025

Renovation of a municipal facility in Chamblee, Georgia. Working plans call for the renovation of a municipal facility.

The City of Chamblee, Georgia is seeking to renovate their Public Works Department's Offices. It is the desire of the City to engage the services of Construction Management Firm (s) or Team (s) to implement these renovations. Therefore, the City is seeking a Construction Management Firm(s) or Team(s) based on their qualifications and proposals. Buyer Contact: Todd Hill thill@chambleega.gov 470-395-2307 CONSTRUCTION MANAGEMENT'S GENERAL RESPONSIBILITIES 1. Scope of Services include, but is not limited to: Site analysis and Mobilization Plan Management and execution of a Safety Plan Prepare project schedule and monthly updates Provide necessary Insurance COI's Provide 100% Performance and Payment Bonds prior to Construction Suggest value engineering alternatives and incorporate same into planonce approved Management and execution of all required permits Management and execution of the Procurement Phase Management and execution of all Construction Phaseactivities Management and execution of the Post Construction Phase Execute fully the requirements and intent of the RFP 2. The Firm will be required to assume an active role in the control of time and cost of the project. The Firm shall develop a Master Project critical path method (CPM) schedule reflecting all phases of the project including procurement, construction, and project closeout to the satisfaction of the City of Chamblee. The scheduleshall reflect agreed upon milestones for evaluation of progress and show relationships between tasks, activities, shutdowns and inspection/approvals by responsibility, design discipline, construction trades and phase of the program. Preparation and adherence to the Project Schedule shall be a contractual responsibility of the Firm. The Firm shall remain fully responsible for constructing the project within the established budget and time constraints.

Pre-Construction/Negotiated

Municipal

$1,184,227.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
16
Bidding Soon
1,365
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.