Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 14, 2025 at 8:00 PM
Updated April 15, 2025
Site work and paving for a mixed-use development in Brighton, Michigan. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
Reference Number 0000375349 The work includes furnishing all labor, equipment and materials necessary to complete the work including the construction of two playgrounds, construction of accessible walks at an adjacent picnic shelter, construction of accessible walks at an adjacent campground, and parking lot striping and signage work. Construction requires earthwork operations, playground equipment installation, reinforced concrete pavement, poured-in-place rubber surfacing, engineered wood fiber safety surfacing, under drainage, turf restoration, electrical work, and all incidental construction at Stony Creek Metropark in Oakland and Macomb County, Michigan. A Cashier's Check, Certified Check Or Bid Bond Underwritten By A Surety Licensed In The State Of Michigan, In The Amount Of Five Percent (5%) Of The Bid, As A Guarantee That The Successful Bidder Will Enter Into A Contract. Inquiries regarding this project should be directed to Tim Phillips at 734.673.2575. After the time of opening, no bid may be withdrawn for a period of sixty (60) days The Authority reserves the right to reject any or all bids, to waive irregularities and/or formalities and to make award in any manner deemed in the best interest of the Authority. A. Pavement removal B. Earthwork operations C. Underdrain installation D. Concrete pavement installation E. Aggregate path construction F. Poured-in-place rubber surfacing installation G. Engineered wood fiber safety surfacing installation H. Underdrain installation I. Turf restoration J. Parking lot striping and signage K. Electrical Work This project shall be totally completed on or before October 31, 2025. The Contractor agrees: Construct Playground Reconstructions (Winter Cove and Ridgewood) to include the construction of two playgrounds, construction of accessible walks at an adjacent picnic shelter, construction of accessible walks at an adjacent campground, and parking lot striping and signage work. Construction requires earthwork operations, playground equipment installation, reinforced concrete pavement, poured-in-place rubber surfacing, engineered wood fiber safety surfacing, under drainage, turf restoration, electrical work, and related work and to provide all plant, labor, supplies, new and current materials, transportation, equipment, and incidental and related items necessary to complete this Work. The Contractor agrees to perform the entire Work in accordance with: the Drawings and Specifications entitled "Playground Reconstructions (Winter Cove and Ridgewood), Stony Creek Metropark, Oakland and Macomb County, Michigan", Project No. 509-24-570
Bid Results
Playgrounds / Parks / Athletic Fields
$582,117.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 27, 2025
March 31, 2025
Multiple Locations, Brighton, MI
Related To This Project
Brighton, MI
Bid Date: Mar 07 2025
Brighton, MI
--
Brighton, MI
Bid Date: Apr 01 2025
Brighton, MI
Bid Date: Jun 18 2025
Brighton, MI
Bid Date: Apr 16 2025
Brighton, MI
Bid Date: Apr 23 2025
Brighton, MI
Bid Date: Apr 21 2025
Brighton, MI
Bid Date: May 07 2025
Brighton, MI
Bid Date: Feb 26 2025
Brighton, MI
Bid Date: Feb 24 2025
Brighton, MI
Bid Date: Feb 12 2025
Brighton, MI
Bid Date: Feb 04 2025
Brighton, MI
Bid Date: Jan 28 2025
Brighton, MI
Bid Date: Dec 19 2024
Brighton, MI
Bid Date: Dec 03 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
