Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 4, 2025 at 8:00 PM
Updated June 5, 2025
Site work for a water / sewer project in Edinburg, Illinois. Completed plans call for site work for a water / sewer project.
The work shall generally consist of: The replacement of approximately 11,000 LF of 6" raw and 1,600 LF of 6" potable water main, valves, fittings, hydrants, and appurtenance. Any Contract or Contracts Awarded Under This Invitation for Bids Are Expected to Be Funded in Part by a Loan From the Illinois Environmental Protection Agency (Illinois Epa). Neither the State of Illinois Nor Any of Its Departments, Agencies, or Employees is or Will Be a Party to This Invitation for Bids or Any Resulting Contract. The Procurement Will Be Subject to Regulations Contained in the Procedures for Issuing Loans From the Public Water Supply Loan Program (35iac Part 662), the Davis-bacon Act (40 Usc 276a Through 276a-5) as Defined by the United States Department of Labor, the Employment of Illinois Workers on Public Works Act (30 Ilcs 570), Illinois Works Jobs Program Act (30 Ilcs 559/20-1), and the Federal "Build American, Buy American Act" Requirements Contained in the Infrastrucutre Investment and Jobs Act, Pub. L. No. 117-58. This Procurement is Also Subject to the Loan Recipient's Policy Regarding the Increased Use of Disadvantaged Business Enterprises. The Loan Recipient's Policy Requires All Bidders to Undertake Specified Affirmative Efforts at Least Sixteen (16) Days Prior to Bid Opening. The Policy is Contained in the Specifications. Bidders Are Also Required to Comply With the President's Executive Order No. 11246, as Amended. The Requirements for Bidders and Contractors Under This Order Are Explained in 41 CFR 60-4." In submitting Proposals for the planned work, the Bidder shall declare that only persons or parties interested in the proposed work as Principals are those contained in the Proposal; and that the Proposal is made without collusion with any other person, firm or corporation. Hard copies of the Contract Documents are available for a nonrefundable fee of $100.00 per set and can be obtained from the Engineer at: Benton & Associates, Inc. 1970 West Lafayette Avenue Jacksonville, IL 62650 217-245-4146 (phone) 217-245-4149 (fax) Complete digital Contract Documents are available for a nonrefundable fee of $30.00 by online. Question Deadline 03/12/2025 All questions of a technical nature regarding the project will only be answered in writing by Addendum. Any questions may be submitted by telephone or in writing to Ben Spreen, bspreen@bentonassociates.com or 217.245.4146,or at the Pre-Bid Meeting. Questions should be submitted to the Engineer no later than five (5) working days prior to the bid date. All proposals must be made on the Proposal forms furnished by the Owner's Project Engineer and shall contain the signature of the Bidder. The Owner may waive any informalities or minor defects or reject any or all bids, and to determine which is the lowest, responsive, responsible bid based upon the Base Bid for the work.
Award
Water / Sewer
$448,737.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 19, 2025
April 18, 2025
Multiple Locations, Edinburg, IL
Related To This Project
Edinburg, IL
Bid Date: May 23 2025
Edinburg, IL
--
Edinburg, IL
Bid Date: Aug 16 2024
Edinburg, IL
Bid Date: Sep 08 2023
Glencoe, IL
Bid Date: Feb 21 2025
Rockford, IL
Bid Date: Mar 04 2025
Palatine, IL
Bid Date: Feb 21 2025
Bloomington, IL
Bid Date: Feb 26 2025
Donovan, IL
Bid Date: Feb 12 2025
Clayton, IL
Bid Date: Feb 19 2025
Galesburg, IL
Bid Date: Feb 19 2025
Maywood, IL
Bid Date: Mar 20 2025
Lockport, IL
Bid Date: Feb 18 2025
Lena, IL
Bid Date: Feb 19 2025
Rockford, IL
Bid Date: Feb 19 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
