BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 11, 2025 at 7:00 PM

Updated February 25, 2025

Site work and paving for a road / highway in South Burlington, Vermont. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Paving Program The scope ofwork is described in more detail in the Instructions to Bidders document. In summary, the work involves paving related projects at fourteen different locations throughout the City totaling: o 8,025 tons of asphalt. o 38,050 square yards ofmilling. o 620 square feet ofCrosswalk and stop bar pavement markings. o 21,680 Linear Feet ofWhite "Fog Line" pavement marking. o 10,840 Linear Feet of "Double Yellow" pavement marking. Project Descriptions- 1. All PAVE projects shall be given a top-coat to a thickness of 1.5" of Type IV asphalt. 2. All LEVELING and PAVE shall shim as necessary with Type IV asphalt and top coat to a thickness of 1.5" TYPE IV asphalt. 3. All MILLING projects shall remove 1.5" of existing asphalt, unless otherwise stated. 4. All LINE STRIPING shall be waterborne paint. 5. All STOP BARS and CROSSWALKS shall be epoxy or equivalent. Question Deadline 02/17/2025 at 3:00 PM ET Questions for clarification will be received on the City's web site. Answers to all Contractor's question will be posted on the City's web site.

Post-Bid

Roads / Highways

$500,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
379
Active Projects
178
Bidding Soon
1,925
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2025

July 1, 2025

Project location map

Multiple Locations, South Burlington, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.