Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 12, 2025 at 8:00 PM
Updated March 13, 2025
Renovation of a municipal facility in Miami, Florida. Completed plans call for the renovation of a municipal facility.
1. CONTRACTOR shall review all documents, specifications, plans and scope of work provided by the Miami-Dade County Parks, Recreation and Open Spaces Construction & Maintenance Division Project Manager for work to be completed. 1.1 It shall be the contractor's responsibility to ensure that all required regulatory or proprietary permits are obtained prior to commencement of work. 2. CONTRACTOR shall furnish all labor, equipment and materials required to provide the Kendall Indian Hammocks Maintenance and Construction Division Renovation: 2.1. Prior to submitting bid, the contractor is to visit site and become familiar with areas and requirements as per scope of work needed in RPQ, drawings, and submittals provided by owner to complete project. Contractor shall be required to complete on site measurements as applies for submission of bid. 3. CONTRACTOR shall furnish all labor, equipment and materials required to provide the Renovation of tile of the floor tile throughout the building: 3.1. Contractor shall remove all existing base boards prior to floor tile demolition. 4. CONTRACTOR shall furnish all labor, equipment and materials required to provide the Renovation of all existing Restrooms inside the building: 4.1. This will entail the complete demolition and installation of both restrooms within the building. To include the removal of partitions, fixtures, tiles (floor and wall), counters, etc. 5. CONTRACTOR shall furnish all labor, equipment and materials required to provide the Renovation interior ceiling and lighting, electrical outlets, and HVAC Ducts throughout the building: 5.1. Contractor shall remove existing ceiling tiles and suspension system. Contractor shall dispose of them according to any guidelines set forth by the authority having jurisdiction. 6. CONTRACTOR shall furnish all labor, equipment and materials required to provide the installation of new wall partitions and doors. 7. CONTRACTOR shall furnish all labor, equipment and materials required to provide the installation of Kitchen cabinets, appliances. and accessories. 8. The Contractor is responsible for repairs on anything damaged that is outside of this scope. All work must be performed in accordance with all local, state and federal guidelines. All products used shall be Miami-Dade County approved as well as approved by the Florida Building Code. Note that work is further described in the contract documents listed in Project Volume I 00800 Supplemental General Conditions. Project Location: 11395 SW 79th ST Miami Fl 33173 License requirement : General Building Contractor. Liquidated Damages: $$ Per Day: $250.00 Performance & Payment Bond Required: YES Bid Bond Required: YES Question Deadline 03/03/2025 All Requests for Information (RFI) must be submitted electronically, in word format to Penelope.Quintas@miamidade.gov and a copy filed with the Clerk of the Board at clerkbcc@miamidade.gov Anticipated Start Date: 4/14/2025 Calendar Days for Project Completion: 180
Post-Bid
Municipal
$267,918.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 11, 2025
April 14, 2025
11395 SW 79th St, Miami, FL
Related To This Project
Miami, FL
Bid Date: Mar 18 2025
Miami, FL
Bid Date: Mar 19 2025
Miami, FL
Bid Date: Apr 16 2025
Miami, FL
Bid Date: Mar 11 2025
Miami, FL
Bid Date: Mar 27 2025
Miami, FL
Bid Date: Mar 17 2025
Miami, FL
Bid Date: Feb 19 2025
Miami, FL
Bid Date: Feb 18 2026
Miami, FL
Bid Date: Dec 04 2025
Miami, FL
Bid Date: Mar 12 2025
RFP D/B - Step 2 - Design-Build Services for Shorecrest Flood Mitigation Improvements - D5 - 5679972
Miami, FL
Bid Date: Jul 21 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
