Site work and paving for a mixed-use development in Cambridge, Massachusetts. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Magazine Beach Improvements Phase 2.2 Grassy Beach. The project consists of the next phase, 2.2, of implementation of the master plan, including: a river observation deck, a river dock, shoreline restoration, a "grassy beach" between Veterans' Pool and the river, accessible paths, benches, plantings, and improvements to the eastern end of the parking lot. Bidders must be pre-qualified by MassDOT Highway Division in RECREATIONAL FACILITIES to bid on the above project. Estimated Cost $2,306,000.00 Contractor Qualification Highway Division Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The contractor should consider these requirements of 6% for MBE (Minority Business Enterprise) 10% for WBE (Women Business Enterprise) and 3% VOBE requirement (Veteran-Owned Business Enterprise) as requirements under the contract. The applicable local minority workforce utilization percentage is a minimum goal of 15.3%. The applicable local women workforce utilization percentage is a minimum goal of 6.9%. Questions are due by Friday February 21, 2025, at 12:00PM

Post-Bid

Water / Sewer

$2,306,000.00

Public - State/Provincial

Paving, Site Work

23

16

23

4

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Athletic Equipment, Exercise Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Furniture, Seating, Chairs, Other Furnishings, Site Furnishings
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Pruning, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Storage Tanks, Storm Drainage Utilities, Subdrainage
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Dies and Molds, Dies
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors

Find More Local Projects

Within 75 Miles of This Project
457
Active Projects
273
Bidding Soon
2,884
All Active Projects
1,331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2025

May 5, 2025

img_map_placeholder

719 Memorial Dr, Cambridge, MA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Magazine Beach Improvements Phase 2.2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.