EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 24, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Denver, Colorado. Completed plans call for the renovation of a educational facility.

Reference Number 0000375622 Job Location: Denver, CO - Auraria Campus Bid Intent Not Available Estimated Construction Cost: $376,706.00 Community College of Denver (CCD) and the Auraria Higher Education Center (Auraria Campus) extend this request to qualified general abatement contractors (Contractors) to provide bids for the asbestos abatement and Regulated Building Materials (RBMs) removal for the Projects listed above (Project CCD and Project B). The Boulder Creek Building is located at 900 10th Street Plaza in Denver, Colorado 80204 (Project Site). The Projects include the renovation of the interior of the building and an expansion of the building to the south. Prior to renovation activities, asbestos-containing materials (ACM) and RBMs are required to be properly removed and managed in accordance with applicable regulations and this specification. Scope of Services: Please see the attached and incorporated Appendix D - Asbestos Abatement and Regulated Building Materials Removal Specification dated November 25, 2024, including Drawing No. 1, Drawing No. 2, and Drawing No. 3 prepared by Professional Service Industries, Inc. (PSI). Professional Service Industries, Inc. (PSI), an Intertek company, has developed the specifications and scope of work on behalf of CCD / Auraria Campus (Owner). Contractors are required to verify quantities and conditions affecting the performance of the scope of work. Contractors are also required to comply with all applicable regulations during the performance of the Projects. Anticipated General Abatement Contractor Start March 17, 2025 Anticipated Abatement Start/Finish - Phase 1 April 1 - June 1, 2025 Anticipated Abatement Start/Finish - Phase 2 June 1 - August 1, 2025 Question Deadline 02/14/2025 at 4:00 PM MT Questions are submitted online No, SOLE Point of Contact/Clarification Name: Stacy Tino, CPPB, NIGP-CPP, Procurement Director Agency: Auraria Higher Education Center Phone: 303.556.3289 (office) or 303.859.1464 (cell) Email: stacy.tino@ahec.edu Buyer Preferences, Guidelines & Requirements General Requirements - Certification/Training - Insurance Required - License Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 %

Post-Bid

Educational

$376,706.00

Public - City

Renovation

24

9

2

6

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Fire and Smoke Protection, Applied Fireproofing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Art
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation
Division 26 - Electrical

Division 26 - Electrical

Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Excavation and Fill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving

Find More Local Projects

Within 75 Miles of This Project
105
Active Projects
59
Bidding Soon
907
All Active Projects
455
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2025

March 17, 2025

img_map_placeholder

950 10th St Plaza, Denver, CO

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Abatement for Boulder Creek Health Science Center Renovation, Phase 1 and 2 / AHEC HVAC Infrastructure Replacement (Capital Renewal) (Project B - Boulder Creek)

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.