Renovation of a municipal facility in Miami Beach, Florida. Completed plans call for the renovation of a municipal facility.

Reference Number : 0000375351 The City of Miami Beach Facilities and Fleet Management Department requests your quote for the roof replacement of the 777 Building pursuant to and in accordance with the specifications contained herein. City departments may, but are not required to, utilize the results of this ITQ to acquire the referenced service. Award of ITQ does not grant the successful contractor(s) exclusive rights or any guarantee of work to provide the services. General Conditions: o Pricing to include all labor, tools, materials, equipment, and mobilization. o Any change order must be approved by the Project Manager prior to beginning work. o Vendor will be responsible for all permits, as required. o Contractor shall maintain the site free of debris and trash to be picked up daily. o Department reserves the right to request a Schedule of Values for all bids received. o The City may reject any or all quotations, or any portion of the quotation, as it deems in the best interest of the City. o Contractor is to provide pricing for work to be performed during business hours. o Permits, crane (if needed), and sales tax to be included. o Qualified and certified contractor for the installation, repair, and replacement of roof systems in accordance with the Florida Building Code. o Contractor to provide a detailed Project Schedule with milestone dates within four (4) working days of PO issuance. Scope of Work The project involves replacing the roof of the 777 Building, which has a standard roofing system. o Contractor shall visit the site to verify the estimated quantities and overall conditions of the existing site. o Contractor to prep all surfaces, including grinding off all existing coatings and thoroughly pressure-cleaning the entire roof. o Contractor is responsible for a building department permit and submitting roofing shop drawings in coordination with the as-built for approval. o Manufacturers 20-year NDL warranty cost to be included in project bid. o Contractor to provide minimum 1-year warranty for materials and workmanship. PREPARATION o Cut and remove all existing roofing down to the deck. Remove only as much roofing in one working day period that can be replaced. Water cut off to be installed at the end of each working day to ensure a watertight condition. o It is the contractor's responsibility to determine existing deck on roof. o Broom clean the entire roof. Remove all dust and dirt, and thoroughly clean with a power air blower. INSULATION o Furnish and install PolyIso Roof Insulation to match existing thickness/R-value of 20. Contractors responsibility to determine existing insulation on roof. o Furnish and install Securock Gypsum-Fiber Roof Board over PolyIso. BASE SHEET o Furnish and install one (1) ply of RUBEROID HW 25 Smooth Base torch applied with 100% adhesion. The above work will be performed by trained men proficient in this type of work. CAP SHEET o Furnish and install one (1) ply of RUBEROID HW Plus Granule FR torch applied with 100% adhesion. The above work will be performed by trained men proficient in this type of work. o White ceramic granules will be hand-broadcasted on all asphalt bleed outs. This will aid in the prevention of cracking and alligatoring of the asphalt and result in an aesthetically clean application. VERTICAL PARAPET WALL ROOFING o Furnish and install one (1) ply of RUBEROID HW 25 Smooth Base and one (1) ply of RUBEROID HW Plus Granule FR torch applied with 100% adhesion to all parapet walls and curbs and properly terminate per manufacturer specifications. MISCELLANEOUS INSTALLATIONS o Fire rated perlite can't strip to be installed at all 90-degree angles before flashing. o Shop fabricate and install new 24-gauge stainless steel slip flashing to be attached to existing counter- flashing/ coping cap. o Furnish and install GAF flashing system at penetrations. o Remove and reinstall internal roof drains clamping ring and basket. If there are none existing, new shall be provided. o Remove and reinstall lightning protection. o Furnish and install new 2 1/2 lb. lead stack flashing at all plumbing vents where existing are removed. Set same in mastic and flash per manufacturer's recommendations. o Shop fabricate and install new 24-gauge stainless steel overflow or flow-thru parapet wall scupper drains at existing scuppers. o Shop fabricate and install new 24-gauge stainless steel leader heads and gutters. o Furnish and install GAF approved walkway pads at service side of existing HVAC units and access location. o All interior parapet walls to be inspected and if stucco repair/water proofing system is required, contractor to include additional work in project bid. o Contractor to inspect wall condition over any roof connection. If walls need stucco repair/water proofing system, contractor to include additional work in project bid. o Contractor to include wall repairs in base bid. Project Location: 1701 Meridian Avenue Miami Beach, FL 33139 Estimated Budget: $130,000 Question Deadline 02/18/2025 at 10:00 AM ET Questions are submitted online : Yes. Questions will be allowed Questions must be directed to PMPurchasing@miamibeachfl.gov. Any questions regarding this Addendum should be submitted in writing to the Facilities and Fleet Department to the attention of the individual named below. Contact: Jenny Hernandez Telephone: 305-673-7000 ext. 26188 Email: JennyHernandez@miamibeachfl.gov

Post-Bid

Municipal

$130,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
120
Bidding Soon
1,698
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 28, 2025

March 31, 2025

Project location map

1701 Meridian Ave, Miami Beach, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.