BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 20, 2025 at 7:00 PM

Updated February 21, 2025

Site work, paving and outdoor lighting for a mixed-use development in Thornton, Colorado. Conceptual plans call for site work for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Reference Number 0000375699 Delivery Point: Thornton Project consists of Design Services to construct a concrete trail multi-use path along the south side of Thornton Parkway from the I-25 exit ramp to the northwest corner of Grant Street. The project includes the following: a multi-use path replacing a dirt social path; upgrading existing ramps to current proposals; landscaping; drainage improvements; safety improvements for pedestrians, bicycles, and vehicles, such as handrails and guardrails; lighting changes; and most likely a retaining wall. Project Description: Project consists of Design Services to construct a concrete trail multi-use path along the south side of Thornton Parkway from the I-25 exit ramp to the northwest corner of Grant Street. The project includes the following: a multi-use path replacing a dirt social path; upgrading existing ramps to current proposals; landscaping; drainage improvements; safety improvements for pedestrians, bicycles, and vehicles, such as handrails and guardrails; lighting changes; and most likely a retaining wall. Right-of-Way (ROW) temporary easement and possible acquisition required. Design to present two (2) options: 1) construct a retaining wall to construct the path in existing ROW, and 2) eliminate or reduce the retaining wall required and identify property needed for this option. Project is federally funded, plans and specifications will need to conform to Colorado Department of Transportation (CDOT) standards and format. Question Deadline 02/19/2025 at 5:00 PM MT Questions are submitted online No, All questions shall be directed in writing to Keith Griess, Contract Administrator, 9500 Civic Center Drive, Thornton, CO 80229-4326, fax 303-538-7556, or e-mail - Keith.Griess@ThorntonCo.gov Disadvantaged Business Enterprises involvement has been set at ten percent (10%) for this project. Buyer Preferences, Guidelines & Requirements Participation Requirements - Disadvantaged Business Enterprise (DBE) General Requirements - Federally Funded - Insurance Required Thornton reserves the right to reject any and all Proposals, in part or in whole, and to award the Project to the most responsive and responsible firm(s) as deemed in the best interest of Thornton; further, the right is reserved to waive any formalities or informalities contained in said Proposal(s).

Conceptual

Sidewalks / Parking Lot

$700,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
4
Bidding Soon
981
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2026

Project location map

Thornton Pkwy, Thornton, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.