Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published April 30, 2025 at 8:00 PM
Updated May 1, 2025
Site work for a water / sewer project in Thornton, Colorado. Conceptual plans call for site work for a water / sewer project.
Reference Number 0000380789 Delivery Point: City of Thornton The scope of this Professional Service Agreement (Agreement) includes the design and engineering required to prepare the bid package for the construction and installation of approximately 12,500 linear feet (LF) of 36-inch diameter potable water transmission line to facilitate water delivery to the Zone 1 storage tanks. The 36-inch waterline will begin at the Holly Street Booster Pump Station (located on the northwest corner of Holly Circle South and Holly Street). Two potential alignment options are provided in Exhibit A - one along the Holly Street and 140th Avenue arterial roadways, and another that extends through the Trail Winds Parks complex. The waterline will connect to an existing 30-inch stub-out on the discharge side of the booster pump station, extend north, and will terminate at a 36-inch stub-out located at East 140th Avenue and Dahlia Street. A 36-inch waterline connection will be required to tie into Thornton's existing 42-inch waterline located on the upstream side of the booster pump station. This portion of waterline will include a check valve for operational flexibility. Refer to Exhibit B for more detail. Question Deadline 04/21/2025 at 5:00 PM MT Questions are submitted online No, All questions shall be directed in writing to Andrew Villarreal, Contract Administrator, 9500 Civic Center Drive, Thornton, CO 80229-4326, fax 303-538-7556, or e-mail - Andrew.Villarreal@ThorntonCo.gov. Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required - License Required Award Requirements - All or None Award Thornton reserves the right to reject any and all Proposals, in part or in whole, and to award the Project to the most responsive and responsible firm(s) as deemed in the best interest of Thornton; further, the right is reserved to waive any formalities or informalities contained in said Proposal(s).
Conceptual
Water / Sewer
$300,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 15, 2026
Holly St, Thornton, CO
Related To This Project
Thornton, CO
Bid Date: May 08 2025
Thornton, CO
Bid Date: Apr 09 2025
Thornton, CO
--
Thornton, CO
Bid Date: Apr 16 2025
Thornton, CO
Bid Date: Apr 09 2025
Thornton, CO
Bid Date: May 15 2025
Thornton, CO
Bid Date: Apr 08 2025
Thornton, CO
Bid Date: Jun 25 2025
Thornton, CO
Bid Date: Mar 21 2025
Thornton, CO
Bid Date: Dec 31 2025
Thornton, CO
--
Thornton, CO
Bid Date: Mar 19 2025
Thornton, CO
Bid Date: Feb 12 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
