BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 14, 2025 at 8:00 PM

Updated April 15, 2025

Site work for a road / highway in Lovely, Kentucky. Completed plans call for site work for a road / highway.

The James & Sue Stepp site is characterized by an approximate 1 acre slide. A portion of that slide damaged the Stepp residence by moving it off its foundation. A second area of the slide was essentially stopped when it encountered a level plateau adjacent to the Stepp home. Areas around the Stepp residence were inundated with mud and debris; although much of that has been cleaned up by the property owner and neighbors. The vast majority of the slide material will be removed by stripping to rock. A small portion of the slide near the plateau will be regraded to a stable configuration. An excavated rock ditch (AML Standard 21- 60-1) will be constructed in the approximate center of the hollow with concrete block tied mat placed to direct water to a culvert and away from the residence. It is not anticipated that trees in excess of 3 inches diameter at breast height will require removal as all tree removal will be completed within the confines of the unstable area. All trees removed as part of the project must be relocated to the waste area for burning unless a suitable area is identified at the project site. If required, AML will elect to make a payment to the Imperiled Bat Conservation Fund in accordance with a determination from USFWS. Residential seeding is included to revegetate disturbed areas on the property along with hydroseeding the slide area. Other revegetation bid items included to revegetate the waste area. Access to the project site and waste area is via county or state roads and residential driveways. Repairs to the driveways are included in the bid items. Construction disturbances will be kept to a minimum with a stringently formulated sediment and erosion control program. Prior to beginning any major earth disturbance, all silt control measures will be installed. This includes silt barriers (bales & silt fence) at the project site and the waste area. Estimated Length of Project: (Substantial Completion) + 120 Calendar Days (Final Completion) ALL PROCUREMENT QUESTIONS SHALL BE DIRECTED TO BUYER OF RECORD FOR THIS PROJECT. Question Deadline 02/28/2025 All questions regarding the meaning or interpretation of the bidding documents shall be directed in writing to the purchasing officer. Unless otherwise specified in the Solicitation, questions received less than ten (10) calendar days prior to the date for receipt of bids may not be answered.

Award

Roads / Highways

$1,533,526.00

Public - State/Provincial

Site Work

9

3

21

7

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
76
Bidding Soon
685
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2025

March 13, 2025

Project location map

241 Buck Branch Rd, Lovely, KY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.