Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published March 6, 2025 at 7:00 PM
Updated October 1, 2024
Renovation of a mixed-use development in Edmond, Oklahoma. Completed plans call for the renovation of a educational facility; and theater / auditorium.
Plans call for the replacement of the existing windows at the Mitchell Hall Theatre. Work for this project will occur during UCO's summer break 2025. Bid Packages in this advertisement: #08.0 - Aluminum-Clad Wood Windows 1. Furnish all labor, material, and equipment to perform all work required to remove and replace existing windows on the original wing of the Mitchell Hall Theatre Building in strict accordance with the Construction Documents and all Authorities Having Jurisdiction. 2. Refer to attached drawings Bid Package #08.0 - Aluminum-Clad Wood Windows - Window Plan 1st Floor, Bid Package #08.0 - Aluminum-Clad Wood Windows - Window Plan 2nd Floor and Bid Package #08.0 - Aluminum-Clad Wood Windows - Window Plan Mezzanine Level for window locations. 3. Furnish and install fixed aluminum-clad wood windows at all locations except those described in item #4 below. 4. Furnish and install single hung aluminum-clad wood windows at the 2 nd floor office area (not including those in the stairwells) and the mezzanine level. 5. Provide for all shipping, offloading and staging of materials. 6. Provide shop/coordination drawings. 7. Furnish and install black window film at the five windows at the auditorium. 8. Furnish and install all shims, caulking, sealants, and glazing tapes required for this scope of work. 9. Windows to have tempered glass. 10. Provide for the removal and disposal of existing windows. 11. Cleanup and haul off trash generated by this scope of work. 12. Provide lifts and or scaffolding as required for this scope of work. 13. Flagg off lifts/scaffolding and work area from pedestrian traffic. 14. Windows to be removed in a manner to allow for the installation of the new windows to occur immediately so that the building is not left exposed to the elements or unprotected. 15. Final clean windows after installation. 16. Windows to have a 10-year warranty and a 20-year warranty on the glass. 17. Windows to be prefinished aluminum on the outside and have a factory painted finish on the interior. 18. All work to be completed during the UCO's Summer Break (between May 12, 2025 and July 31, 2025). Direct all inquiries to the construction manager. Women Owned Businesses & Minority Owned Business are encourage to participate. Addendum #1-#2 have been issued as of 2-25-2025.
Award
Educational
$100,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 03 - Concrete
Division 04 - Masonry
Division 06 - Wood, Plastics, and Composites
Division 07 - Thermal and Moisture Protection
Division 08 - Openings
Division 09 - Finishes
Division 23 - Heating Ventilating and Air Conditioning
Division 31 - Earthwork
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 5, 2025
April 4, 2025
100 N University Dr, Edmond, OK
Related To This Project
Edmond, OK
Bid Date: Feb 18 2025
Edmond, OK
Bid Date: Mar 05 2025
Edmond, OK
Bid Date: Mar 06 2025
Edmond, OK
Bid Date: Mar 20 2025
Edmond, OK
--
Edmond, OK
Bid Date: Apr 03 2025
Edmond, OK
Bid Date: Mar 27 2025
Edmond, OK
Bid Date: Mar 27 2025
Edmond, OK
Bid Date: Feb 27 2025
Edmond, OK
Bid Date: Feb 20 2025
Edmond, OK
Bid Date: Feb 20 2025
Edmond, OK
Bid Date: Feb 10 2025
Edmond, OK
Bid Date: Jan 30 2025
Edmond, OK
--
Edmond, OK
Bid Date: Jan 30 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.