EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 6, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Edmond, Oklahoma. Completed plans call for the renovation of a educational facility; and theater / auditorium.

Plans call for the replacement of the existing windows at the Mitchell Hall Theatre. Work for this project will occur during UCO's summer break 2025. Bid Packages in this advertisement: #08.0 - Aluminum-Clad Wood Windows 1. Furnish all labor, material, and equipment to perform all work required to remove and replace existing windows on the original wing of the Mitchell Hall Theatre Building in strict accordance with the Construction Documents and all Authorities Having Jurisdiction. 2. Refer to attached drawings Bid Package #08.0 - Aluminum-Clad Wood Windows - Window Plan 1st Floor, Bid Package #08.0 - Aluminum-Clad Wood Windows - Window Plan 2nd Floor and Bid Package #08.0 - Aluminum-Clad Wood Windows - Window Plan Mezzanine Level for window locations. 3. Furnish and install fixed aluminum-clad wood windows at all locations except those described in item #4 below. 4. Furnish and install single hung aluminum-clad wood windows at the 2 nd floor office area (not including those in the stairwells) and the mezzanine level. 5. Provide for all shipping, offloading and staging of materials. 6. Provide shop/coordination drawings. 7. Furnish and install black window film at the five windows at the auditorium. 8. Furnish and install all shims, caulking, sealants, and glazing tapes required for this scope of work. 9. Windows to have tempered glass. 10. Provide for the removal and disposal of existing windows. 11. Cleanup and haul off trash generated by this scope of work. 12. Provide lifts and or scaffolding as required for this scope of work. 13. Flagg off lifts/scaffolding and work area from pedestrian traffic. 14. Windows to be removed in a manner to allow for the installation of the new windows to occur immediately so that the building is not left exposed to the elements or unprotected. 15. Final clean windows after installation. 16. Windows to have a 10-year warranty and a 20-year warranty on the glass. 17. Windows to be prefinished aluminum on the outside and have a factory painted finish on the interior. 18. All work to be completed during the UCO's Summer Break (between May 12, 2025 and July 31, 2025). Direct all inquiries to the construction manager. Women Owned Businesses & Minority Owned Business are encourage to participate. Addendum #1-#2 have been issued as of 2-25-2025.

Award

Educational

$100,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Quality Assurance, Field Samples, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry, Millwork, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection
Division 08 - Openings

Division 08 - Openings

Windows, Wood Windows, Roof Windows and Skylights, Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Flooring, Terrazzo Flooring
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Special Foundations

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
40
Bidding Soon
496
All Active Projects
202
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2025

April 4, 2025

img_map_placeholder

100 N University Dr, Edmond, OK

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

UCO Mitchell Hall Theatre Window Replacement

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.