BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 28, 2025 at 7:00 PM

Updated March 1, 2025

Site work and paving for a mixed-use development in West Saint Paul, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Intersections improvements project. Approximate quantities are as follows: Clearing and Grubbing 2 EA Remove Curb and Gutter 2,750 LF Remove Driveway Pavement 275 SY Pavement Sawing 480 LF Remove Bituminous/Concrete Pavement 7,500 SY Remove Manhole/Catch Basin 4 EA Abandon Water Main 400 LF Remove Water Main 450 LF Excavation - Common 4,700 CY Select Granular Embankment 2,700 CY Plastic Liner 135 SY Aggregate Base Class 5 1,100 CY Concrete Pavement 7.0" 150 SY Bituminous Pavement 2,450 TON Deciduous Tree 3 EA Sediment Control Log Type Compost 1,800 LF Seeding 0.50 ACRE Granular Backfill 2,000 TON 15" RC Pipe 300 LF 4" Perf PE Pipe Drain 1,700 LF 6" Watermain Ductile Iron CL 53 1,100 LF 6" Watermain HDPE (Directionally Drilled) 170 LF Ductile Iron Fittings 900 POUND Const Drainage Structure 72 LF Concrete Walk 11,700 SF Concrete Curb and Gutter 2,600 LF 8" Concrete Driveway 325 SY Lighting Unit and Foundation 14 EA Underground Wire 4,600 LF Sign 88 SF Traffic Control Signal System 1 EA Deciduous Shrub 87 EA Boulevard Topsoil Borrow 360 CY Striping (Multi-Comp) 2,200 LF Site Directions: Intersection of Smith Ave (TH 149) and Dodd Road (TH 149). The bid bonds must be payable to the City of West St. Paul in the amount of five percent (5%) of the amount of the vbid, to be forfeited as liquidate damages in the event that the vbid is accepted and the bidder fails to promptly enter into a written contract and furnish the required bonds. The City reserves the right to reject any or all bids, to waive irregularities, and to award the contract in the best interests of the Owner. The City may retain the deposits of the three lowest bidders for a period of at least sixty (60) days after the date set for the opening of bids. PROJECT NO. 173-010-008, 1917-55, 173-114-011 Project No. B2310676

Bid Results

Roads / Highways

$1,928,796.00

Public - City

Paving, Site Work

155

34

6

5

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
260
Active Projects
126
Bidding Soon
1,565
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2025

May 26, 2025

Project location map

Smith Ave S & Dodd Rd, West Saint Paul, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.