Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published February 28, 2025 at 7:00 PM
Updated October 1, 2024
Demolition, site work and renovation of a mixed-use development in Meridian, Idaho. Completed plans call for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.
Bathroom Partition Installations The Board of Trustees of West Ada School District is requesting bids for bathroom partition installations at Sawtooth Middle School, Eagle Middle School, and Eagle High School. The General Contractor will oversee the project as well as provide all labor and materials. Bids must be provided on a lump sum basis. This project will be divided into two scopes. Scope A will involve demolition and installation of new bathroom partitions and floor repair at Sawtooth Middle School and Eagle Middle School. Scope B will involve demolition and installation of new bathroom partitions and complete bathroom floor replacements at Eagle High School. Questions regarding this proposal must be submitted through online Questions Due Date: Feb 19th 2025, 4:00 PM MST Deadline to Submit Substitution Requests Online Portal Upload Substitution Request Form in the Q&A section under Vendor Discussions. Feb 19th 2025, 4:00 PM MST Bids received after the deadline will not be considered and no bidder may withdraw his/her bid after the deadline or before the award unless said award is delayed for a period exceeding sixty (60) days. No bid may be withdrawn after the scheduled time for receipt of bids unless the award of contract is delayed for a period exceeding sixty (60) days. A bid bond in the amount of 5% of the total bid amount, including any bid alternates is required. Bidders shall be licensed in the State of Idaho, in accordance with provisions of an act known as "Public Works Contractor's State License Law, Title 54, Chapter 19, Idaho Code Amended." The Term "Public Works Contractors" includes the general, sub, or specialty contractor. The bidder's name must agree to the name on the public works license that is referenced in the bid. The successful contractors shall carry out his employment practices and payment of wages according to the provisions of an act known as "Public Works Title 44, Chapter 10, Section 44-1001 through 44-1006 inclusive, Idaho Code Amended" and shall comply with the Equal Employment Opportunity Provisions as defined in the code of respective Federal Regulations. The Board of Trustees of Joint School District No. 2 reserves the right to disregard all non-conforming, non-responsive or conditional bids, to waive any minor informality/irregularity, to reject all bids, or to accept the bid or bids it deems best. The West Ada School District is an Equal Opportunity Provider. Anticipated Award Date: 03/10/2025
Post-Bid
Educational
$14,000.00
Public - County
Demolition, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
15
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 09 - Finishes
Division 10 - Specialties
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 34 - Transportation
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 27, 2025
May 26, 2025

Multiple Locations, Meridian, ID
Related To This Project
Meridian, ID
Bid Date: Feb 26 2025
Meridian, ID
--
Meridian, ID
--
Meridian, ID
--
Meridian, ID
Bid Date: Mar 28 2025
Meridian, ID
Bid Date: Mar 31 2025
Meridian, ID
Bid Date: Apr 10 2025
Meridian, ID
--
Meridian, ID
Bid Date: Mar 11 2025
Meridian, ID
Bid Date: Mar 05 2025
Meridian, ID
--
Meridian, ID
Bid Date: Feb 19 2025
Meridian, ID
Bid Date: Feb 13 2025
Meridian, ID
Bid Date: Feb 19 2025
Meridian, ID
Bid Date: Jan 29 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Share with your network.
Bathroom Partition Installations: Sawtooth Middle School, Eagle Middle School, Eagle High School
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.